22297

CONDITIONAL

Clare - Clare County Council

Proposed Development

to retain air handling unit located to rear of building and 2 no. chiller units with shed located to side of building; and planning PERMISSION for generator located to rear of building, 5 no. chiller units with new shed to side of building, high level louvre panels to existing building and all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Apr 2022

  2. Decision: CONDITIONAL

    23 May 2022

  3. Decision due

    29 May 2022

  4. Grant issued

    4 Jul 2022

Application Details

Location
Drumline , East Park , Shannon Free Zone Shannon Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
4 April 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 May 2022
Grant Date
4 July 2022
Permission Expires
3 July 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560472CONDITIONAL1 Aug 2025

for an external plant compound enclosed with a security fence to include Air Conditioning Units with condensers and dedicated outdoor air system on existing roof plant area, Chillers, Thermal Storage Tanks, Pump house, Generators, Transformers, and all ancillary site works

Drumline East Park , Shannon Free Zone , Shannon Co. Clare

157m
201001CONDITIONAL22 Dec 2020

to extend the existing 30 metre high, free standing lattice communication structure by an additional 3 metres in height to allow for additional antennae, dishes and all ancillary equipment at ESB Telecoms Ltd Telecommunications Compound at ESB Drumline 110kV Substation

Drumline , Shannon , Co Clare

157m
1790CONDITIONAL10 Feb 2017

to maintain the existing 30 metre high, free standing lattice communication structure, carrying antennae and communication dishes within an existing 2.4 metre high chainlink fence compound previously granted temporary permission LPA Ref P12/282 at ESB Telecoms Ltd telecommunication compound at ESB Drumline 110 kV Substation, Drumline, Shannon

Drumline , Shannon , Co. Clare

214m
2549CONDITIONAL24 Feb 2025

for the proposed installation of solar panels on a steel frame structure to be erected over the roof of an existing telecommunication cabin (covering an area of approximately 48 sq.m to a maximum height of 4.8 metres above ground level). To include all ancillary development works and landscaping to the southwest of the telecommunications compound

ESBs' Drumline 110kV Substation , Drumline , Shannon Co Clare

219m
17156CONDITIONAL3 Mar 2017

for the following: 1 (a) RETAIN garage door on East elevation of garage/store, 1(b)RETAIN door on West elevation of garage/store, 1(c) RETAIN window on Southern gable of garage/store. 2 RETAIN shed to the back of dwelling house, 3(a) RETAIN 2 no. Windows and one pair of sliding doors on Eastern elevation of dwelling house. 3(b) RETAIN window to front ( Southern ) elevation of dwelling house

Drumline , Newmarket-on-Fergus , Co. Clare

225m
19994CONDITIONAL19 Dec 2019

to construct logistics (warehouse and distribution) building with photo-voltaic arrays on the roof with supporting offices, signage, flag poles, HGV, car and cycle-parking, service yard, new vehicular entrance/exit, connection to existing estate sewers, ESB sub-station, landscaping, boundary treatment and all ancillary site works necessary to facilitate the proposed development

East Park Shannon Free Zone , Ballycasey Beg , Smithstown Shannon

228m
22810CONDITIONAL9 Sept 2022

to erect signage to logistics (warehouse and distribution) building

Shannon Free Zone , Ballycasey Beg , Smithstown Shannon

241m
2560529CONDITIONAL29 Aug 2025

for (a) 12 no. 2MW Hydrotreated Vegetable Oil (HVO) generators; (b) 6 no. self-bunded 69m3 HVO tanks; (c) 6no. self-bunded 6m3 AdBlu tanks; (d) a 182m2 electrical/control building: (e ) a customer electrical compound complete with a transformer; (f) an ESB compound connected to the existing adjacent 110kV ESB substation situated immediately east of the proposed development; (g) a fuel loading bay complete with a 7,700L forecourt separator; (h) on site surface soakaways; (i) task lighting columns; (j) 3m high perimeter security fencing and compound separation; (k) new road entrance off the R458; (l) all associated internal access roads, car parking, surface water collection, ducting as required to deliver the works. The proposed development will include connection to public water mains. There is no sewer connection required as foul and process waste will be collected in an underground sealed tank and emptied by a specialist waste service provider. An Appropriate Assessment Screening Report has been prepared for the site. The application relates to a development which comprises an activity requiring an industrial Emissions Directive (IED) licence.

Drumline , Co. Clare

275m
21141CONDITIONAL18 Feb 2021

for works which shall consist of; an extension to the eastern elevation measuring 870m2 to contain new clean room and dispatch facilities, a two-storey extension to the northern elevation measuring 580m2 ground floor an 395m2 first floor to contain new staff welfare facilities, a single storey extension to the northern elevation measuring 640m2 to contain additional warehousing space, a new staff car park with 320 spaces shall be constructed to the north (rear) of the site and accessed by means of a new entrance. A separate new goods entrance shall be constructed to the front of the site to the east of the existing staff entrance. All site ancillary works including temporary relocated car park spaces and access to same

Building 2 , East Park Shannon Industrial Estate , Shannon Co Clare

276m
2460436N/A9 Sept 2024

for the proposed development consist of: -A two-storey manufacturing expansion 13m high with a footprint of 2168.125 m2 and an overall floor area of 4340 m2 over two floors located to the North and adjoining the existing facility. - The facility shall be clad in micro-rib external cladding to match existing and contain a single loading dock arrangement on its western elevation. - A single storey electrical room measuring 12m x 5m x 3m high constructed from block cavity construction and completed with a built up concrete flat roof shall be located on the eastern side and adjoining the new development. - A single storey metal clad steel structure to house new equipment measuring 12m x 7m x4m high and located on the northern elevation of the existing building adjoining the new development. - A new perimeter roadway extending into the existing northern fallow area. - All associated site works and temporary works.

Building 2 East Park , Shannon Industrial Estate , Shannon Co Clare V14WN80

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?