22311
CONDITIONALClare - Clare County Council
Proposed Development
for the development which will consist of a dwelling house and proprietary wastewater treatment system & percolation area together with ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
7 Apr 2022
Further information requested
31 May 2022
Further information received
26 Aug 2022
Decision: CONDITIONAL
21 Sept 2022
Decision due
22 Sept 2022
Grant issued
27 Oct 2022
Application Details
- Location
- Dough , Kilkee , Co Clare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
- Floor Area
- 188.3 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 7 April 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 September 2022
- Grant Date
- 27 October 2022
- Permission Expires
- 26 October 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the following development: 1. PERMISSION to develop a serviced touring caravan/glamping site, with 23 no. pitches for touring caravans and 4 no. glamping pods. 2. PERMISSION for facilities building. 3. PERMISSION for holding tank/pumping station and rising main connection to existing public sewer, including all ancillary site works and services. 4. PERMISSION for new site entrance with lay-by area
Dough , Kilkee , Co Clare
to develop a serviced caravan / motor home / camping and glamping park consisting of set-down bays for 26 no. static motor homes, 18 no. touring campervans, 8 no. pitches for camping / glamping pods including facilities building, provision of holding tank and pumping station connected to Town sewer, together with all associated site works and services
Dough , Kilkee , Co. Clare
to construct agricultural storage shed, entrance and all ancillary site works
Dough , Kilkee , Co Clare
for development at a 1.33 hectare site at Dough, Kilkee, Co Clare, located north of Moonin Estate. The development will consist of a Caravan Park together with all associated and ancillary works including site access from an unnamed road to the south, site services, boundary treatment, landscaping and visitor amenities in a single storey block on the site
Dough , Kilkee , Co Clare
for development at a 1.33 hectare site at Dough Kilkee, Co Clare, located north of Moonin estate. The site is accessed from an unnamed local road to the south of the site. the development will consist of: a) Construction of 38 no. 2 storey dwellings consisting of 28 no 3-bed and 10 no. 2-bed houses. Semi-detached and terraced dwellings are proposed. b) Provision of a new vehicular and pedestrian entrance to the south; c) Provision of footpath to northern side of the local road along the site's southern boundary; and d) All associated site clearance and development works, provision of internal access road and potential future connections to neighbouring sites, public open space, relocated and upgraded pumping station, drainage and hard and soft landscaping, car and bike parking, bin storage, and all other ancillary works
Dough , Kilkee , Co Clare
for development at a 1.35 hectare site at Dough Kilkee Co Clare located North of Moonin Estate. The site is accessed from an unnamed local road to the south of the site. The development will consist of: a) Construction of 38 no. 2 storey dwellings consisting of 28 no. 3-bed and 10 no. 2-bed houses. Semi-detached and terraced dwellings are proposed. b) Provision of a new vehicular and pedestrian entrance to the south; c) Provision of footpath to northern side of the local road along the site’s southern boundary; and d) All associated site clearance & development works, provision of internal access road and potential future connections to neighbouring sites, public open space, relocated and upgraded pumping station, drainage and hard & soft landscaping, car and bike parking, bin storage, and all other ancillary works.
Dough , Kilkee , Co. Clare
for development at a 1.33 hectare site at Dough, Kilkee, Co Clare located north of Moonin estate. The development will consist of a Caravan Park / Camp Site / Motor Home Park (Tourist uses) / Glamping Use together with all associated ancillary works including site access from an unnamed road to the south, site services, boundary treatment, landscaping, and visitor amenities in a single storey block on the site.
Dough , Kilkee , Co Clare
to alter and extend existing dwelling house
Sky Road , Dough , Kilkee
to RETAIN mobile home to rear of existing Garage/Filling station for use as a temporary managers/security accommodation with connection to existing services, plus all ancillary site works
Dough , Kilrush Road , Kilkee
to construct a 20 metre high free standing monopole communication structure and its associated antennae communication dishes and ground equipment, within a 2.4m high palisade fence compound at ESB's Kilkee 38kV substation
Kilrush Road , Dough , Co. Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?