2232
CONDITIONALTipperary - Tipperary County Council
Proposed Development
1) ground floor extension to an existing detached residence and a storage shed in the rear garden and 2) PERMISSION for Photovoltaic Solar Panels on front roof and the extension roof and an awning between the main house and garage
View the full application file on the council's planning portal →Application Timeline
Application received
18 Jan 2022
Decision: CONDITIONAL
8 Mar 2022
Decision due
14 Mar 2022
Grant issued
11 Apr 2022
Application Details
- Location
- 44 The Brook , Ballina , Co Tipperary
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.13 ha
Timeline
- Registration Date
- 18 January 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 8 March 2022
- Grant Date
- 11 April 2022
- Permission Expires
- 10 April 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
of ground floor extension to an existing detached residence and a storage shed in the rear garden and Permission for Photovoltaic Solar Panels on front roof and the extension roof and an awning between the main house and garage
44 The Brook , Ballina , Co. Tipperary V94 X8F1
alterations and extensions and associated site work
46 The Brook , Ashgrove Meadows , Ballina
alterations and extensions of an existing detached residence and associated work
46 The Brook , Ashgrove Meadows , Ballina
a side extension to existing dwelling, alterations to existing elevations, a detached garage, an attached store and carport and all ancillary works
52 The Brook , Ballina , Co. Tipperary
a single storey extension incorporating ensuite bathroom to the side of the existing dwelling together with all associated site and incidental works
21 The Beeches , Ballina Killaloe PO , Tipperary
to construct a storey and a half extension to the side of the existing dormer dwelling house along with all associated site works
15 Ashgrove Meadows , Ballina , Co Tipperary
to construct a storey and a half extension to the side of the existing dormer dwelling house and the addition of one new window to each side elevation of the existing house along with all associated site works
15 Ashgrove Meadows , Ballina , Co Tipperary
single storey extension to side of existing dwelling, associated internal alterations, detached domestic garage/fuel store, reconfiguration of existing entrance/driveway, boundary treatments together with all associated works
55 The Brook , Ballina
single storey extension to side of existing dwelling, associated internal alterations, detached domestic garage, fuel store, reconfiguration of existing entrance/driveway, boundary treatments together with all associated works
55 The Brook , Ballina
the construction of an extension to the dwelling, and alterations to the dwelling, and ancillary works
14 The Beeches , Shannon View , Ballina Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?