The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

22340

N/A

Mayo - Mayo County Council

Proposed Development

SECTION 5 DECLARATION: CONVERT EXISTING 16.38 SQ M GARAGE TO BEDROOM

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 May 2022

  2. Decision due

    5 Jun 2022

Application Details

Location
BRIDGE STREET , KILKELLY , CO MAYO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Mayo County Council

Timeline

Registration Date
9 May 2022
Status
APPLICATION FINALISED
Decision
N/A
Decision Due
5 June 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

204m
22143CONDITIONAL28 Feb 2022

DEMOLITION OF EXISTING 2 NO. COMMERCIAL PROPERTIES, DEMOLITION OF EXISTING DWELLING HOUSE AND THE CONSTRUCTION OF 4 NO. DWELLING HOUSES, CONNECTION TO EXISTING PUBLIC SERVICES TOGETHER WITH ALL ANCILLARY WORKS

MARKET PLACE , KILKELLY , CO MAYO

207m
2660592N/A23 Jul 2026

The proposed development will consist of the following: 1. The construction of 24 no. houses with a mix of 2, 3 and 4 bedrooms 2.Provisions of site infrastructure including a vehicular entrance from River View Road, on site car parking for residents and visitors and 12 no. bicycle stands. 3. Installation of a ESB sub station, site lighting, hard and soft landscaping 4. All other associated and ancillary development and works above and below ground level to complete the project in accordance with building regulations.

River View Road , Kilkelly , Co. Mayo

207m
2660493N/A23 Jun 2026

The proposed development will consist of the following: 1. The construction of 24 no. houses with a mix of 2, 3 and 4 bedrooms 2.Provisions of site infrastructure including a vehicular entrance from River View Road, on site car parking for residents and visitors and 12 no. bicycle stands. 3. Installation of a ESB sub station, site lighting, hard and soft landscaping 4. All other associated and ancillary development and works above and below ground level to complete the project in accordance with building regulations.

River View Road , Kilkelly , Co. Mayo

222m
2460498CONDITIONAL12 Aug 2024

DEMOLITION OF REMAINDER OF EXISTING BUILDING, CONSTRUCTION OF NEW BAR AND LOUNGE AREA WITH OUTDOOR SPACE AT GROUND LEVEL AND CONSTRUCTION OF 3 NO APARTMENTS INCLUDING ALL ASSOCIATED SITE WORKS.

MARKET PLACE , KILKELLY , CO MAYO.

244m
22159N/A3 Mar 2022

CONSTRUCTION OF TWO NUMBER SEMI-DETACHED TWO-BEDROOM DWELLING HOUSES TOGETHER WITH ALL ANCIILARY SITE WORKS AND SERVICES

BALLAGHADEREEN ROAD , KILKELLY , CO MAYO

244m
22860CONDITIONAL4 Oct 2022

Construction of two number two bedroom apartments together with all ancillary site works and services.

Ballaghaderreen Rd , Kilkelly

277m
17184CONDITIONAL15 Mar 2017

RETAIN EXTENSION TO THE REAR AND THE SIDE OF DWELLING HOUSE AND A DOMESTIC GARAGE

KILKELLY , CO. MAYO

352m
17124CONDITIONAL23 Feb 2017

CONSTRUCT NEW COMMUNITY BUILDING COMPRISING MEETING ROOMS, FUNERAL PARLOUR, ANCILLARY OFFICE, TOILET AND KITCHEN FACILITIES AND CIRCULATION, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES, INCLUDING ENTRANCE AND SITE BOUNDARIES AND CONNECTIONS TO PUBLIC SERVICES

UPPER MAIN STREET , KILKELLY , CO. MAYO

378m
22802CONDITIONAL16 Sept 2022

SOIL RECOVERY FACILITY WITHIN AN APPLICATION AREA OF c.3.2 Ha

LISCOSKER , KILKELLY

378m
2660488CONDITIONAL22 Jun 2026

The development will consist of the importation of inert soil and stone for infilling for restoration works along with the importation of selected C&D and bituminous material for recycling and reuse over an area of 3.2 Hectares and all other ancillary works and services. This site currently operates under a Waste Facility Permit reference WFP-MO-22-0065-01 which is due to expire in 2028. Upon the grant of planning, a revision of the Waste Facility Permit will be sought from Mayo County Council.

Liscosker , Kilkelly , Co. Mayo

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?