The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

22388

CONDITIONAL

Limerick - Limerick County Council

Proposed Development

a dwelling house, wastewater treatment system, percolation area, site entrance and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Apr 2022

  2. Decision: CONDITIONAL

    26 May 2022

  3. Decision due

    1 Jun 2022

  4. Grant issued

    29 Jun 2022

Application Details

Location
Graigoor , Shanagolden , Co. Limerick
Applicant
N/A
Application Type
OUTLINE PERMISSION
Planning Authority
Limerick County Council
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
7 April 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 May 2022
Grant Date
29 June 2022
Permission Expires
28 June 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

7m
23503CONDITIONAL20 Oct 2023

planning ref. 22/388 for a dwelling house, wastewater treatment system, percolation area, site entrance and all associated site works

Graigoor , Shanagolden , Co. Limerick

493m
18123CONDITIONAL14 Feb 2018

proposed extensions to existing house, consisting of, front porch, kitchen/lounge, and dining area with internal changes to existing house and connections to all existing services

Kilbradran , Shanagolden , Co. Limerick.

526m
211602CONDITIONAL19 Nov 2021

dwelling house, site entrance, wastewater treatment system and associated site works and services

Ballylin , Shanagolden , Co. Limerick

735m
2561003N/A2 Oct 2025

six (6) wind turbines with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kV on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and ESB entrances. The building will contain a control room, switchgear room, ESB room and store room, underground electrical and communications cabling between the wind turbines and on-site substation. Grid Connection Option A: 2.54km-long 38kV underground cable connection from the on-site substation to the existing Carrons substation to the west of the site. Grid Connection Option B: Loop into the existing 38kV onsite overhead line via the proposed 38kV substation. A new temporary site entrance off the L1219 local road to the west of the permanent site entrance for the construction phase only. Upgrade of an existing farm entrance and access track off the L1219 local road in the northwest of the site to serve as a permanent site entrance for the wind farm when operational. Approximately 3.4km of new site access tracks with associated turning areas and drainage. This includes approximately 490m of temporary access tracks which will be reinstated following construction. Upgrade of approximately 470m of existing site access tracks. A 9m-long clear span bridge crossing of the Ahacronane River by an internal site access track to the northwest of turbine T1 and an associated 1.5m x 1.0m relief culvert. A permanent meteorological mast with a height of 90m, a foundation and hardstand. Two (2) material storage areas with a total capacity of approximately 39,300m3. A temporary construction compound with an area of approximately 1,375m2. All associated site development works, including drainage, diversion or undergrounding of low voltage powerlines, landscaping and revegetation. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) which have been prepared in respect of the construction, operation and decommissioning of the proposed development, and works to facilitate turbine delivery from the port of Foynes to the wind farm site entrance via L6188, N69, L1222, L1220 and L1219. The Applicant is seeking a 10-year planning permission and 35-year operational life, initiating from the date of full commissioning of the entire wind farm. This development is covered by the provisions of the Renewable Energy Directive III (Directiv

within the townlands of Ballynisky Graigoor Ballyegny More Kilbradran Ballysteen Dunmoylan , Carrons and Lisbane , Co. Limerick

745m
20448CONDITIONAL29 May 2020

construction of a calf house, manure pit and concrete apron

Ballyneety , Shanagolden , Co. Limerick

757m
2673CONDITIONAL23 Mar 2026

the construction of a slatted house, feed passage, slatted tank, creep area, cattle handling unit and concrete apron

Ballyneety , Shanagolden , Co. Limerick.

767m
18547CONDITIONAL1 Jun 2018

the construction of a slatted shed and concrete aprons

Ballyneety , Shanagolden , Co. Limerick.

813m
256N/A15 Jan 2025

a dwelling house, wastewater treatment system, percolation area, access road, site entrance and all associated site works

Lissatotan , Rathkeale , Co. Limerick.

824m
24305N/A25 Jul 2024

the parking of up to 4 No. trucks and up to 6 No. trailers for the use of the occupier and all associated works

Kilbradran , Shanagolden , Co. Limerick

827m
24276CONDITIONAL11 Jul 2024

a domestic storage shed as constructed for the storage of vintage vehicles including vintage trucks and all associated works

Kilbradran , Shanagolden , Co. Limerick

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?