The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

22389

CONDITIONAL

Sligo - Sligo County Council

Proposed Development

development consisting of construction of a dwelling house, domestic garage and connect to public utilities, together with all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Nov 2022

  2. Decision: CONDITIONAL

    18 Jan 2023

  3. Decision due

    24 Jan 2023

  4. Grant issued

    24 Feb 2023

Application Details

Location
Bartragh , Enniscrone , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.167 ha
Floor Area
224.24 sq m
Residential Units
1

Timeline

Registration Date
21 November 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 January 2023
Grant Date
24 February 2023
Permission Expires
23 February 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
17409CONDITIONAL27 Oct 2017

Development consisting of construction of a dwelling house, domestic garage and connection to public utilities, together with all associated site works.

Bartragh , Enniscrone , Co Sligo

60m
18431CONDITIONAL5 Nov 2018

for development consisting of (1) construct a two storey extension to the south elevation to consist of a ground floor porch and a first floor sun room (2) relocate an existing boiler flue and associated site works

No. 49 Marella , Bartragh Townland , Enniscrone

63m
1897UNCONDITIONAL29 Mar 2018

Development consisting of retention and making further alterations to a dwelling house, to include (1) the addition of a porch and bay window to the south elevation (2) fenestration changes to all elevations (3) relocation of the existing chimney (4) internal alterations

No 48 Marella , Bartragh Td , Enniscrone

63m
2361N/A29 May 2023

development consisting of 19 square meter single-storey extension to front of existing dwelling, beneath gable roof to match existing roof pitch of existing dwelling

50 Marella , Enniscrone , Co. Sligo

74m
18216REFUSED1 Jun 2018

Development consisting of permission for construction of a two-storey dwelling house on a vacant site, connect to existing services and carry out all other ancillary site works.

Marella , Bartragh Td , Enniscrone

139m
19321CONDITIONAL2 Aug 2019

development consisting of 1. Retain first floor attic conversion from storage to habitable rooms. (81.9m2) 2. Replace 2 no. Velux windows to the rear with larger windows suitable for escape and rescue. 3. Carry out all ancillary site works

No. 29 Marella , Bartragh Townland , Enniscrone

155m
17287CONDITIONAL26 Jul 2017

for development consisting of (1) Construct an extension to rear of dwelling house to consist of ground floor bedroom and kitchen extension (floor area 39.5 sq.m) with first floor attic storage (floor area = 24 sq.m). (2) Relocate existing centre rear skylight to accommodate new roof (3) Carry out all associated site works and connect to existing services at

No. 30 Marella , Bartragh Townland , Enniscrone

175m
19248CONDITIONAL21 Jun 2019

for development consisting of alterations to the existing dwelling, consisting of converting the attic space to include storage, a mezzanine and patio/balcony area

No. 26 Marella , Bartragh Td , Enniscrone

253m
18354CONDITIONAL6 Sept 2018

Development consisting of retention of alterations to the previous planning granted under PL03/285 (1) changes to the fenestration on all elevations, (2) the removal of a glazed enclosed balcony on the West elevation, (3) the removal of a chimney from the East elevation and one from the South elevation and (4) the removal of timber louvre cladding from all elevations.

Bartragh , Inniscrone , Co Sligo

272m
1969CONDITIONAL1 Mar 2019

for development consisting of the carrying out of alterations to existing dwelling house. Works will consist of the conversion of the attic of existing dwelling house and include minor works and alterations to existing floor plans and elevations together with the carrying out of all associated ancillary site works

No. 8 Marella , Bartragh Td , Enniscrone

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?