The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

22397

CONDITIONAL

Kildare - Kildare County Council

Proposed Development

sought to construct a part single storey, part two storey dwelling, detached garage, new entrance, connection to existing mains water, new wastewater treatment system and percolation area and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Apr 2022

  2. Further information requested

    30 May 2022

  3. Further information received

    23 Aug 2022

  4. Decision due

    19 Sept 2022

  5. Decision: CONDITIONAL

    19 Sept 2022

  6. Grant issued

    14 Nov 2022

Application Details

Location
Geraldine Road , Athy , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.463 ha
Floor Area
243.58 sq m
Residential Units
1

Timeline

Registration Date
7 April 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 September 2022
Grant Date
14 November 2022
Permission Expires
13 November 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

262m
18718REFUSED18 Jun 2018

completion of existing development at Prusselstown Green to replace previously proposed estate design (Reg. Ref: 07/300028 - now expired) for 86 units (13 houses completed) with revised design that follows the established pattern of the development around four green spaces. Proposed development shall consist of one four bedroom two storey detached house, 58 three bedroom two storey semi-detached houses in four designs, 4 no. three bedroom two storey terraced houses, 4 no. two bedroom two storey terraced houses and a crèche (260sqm) with 2 no. two bedroom apartments over and for all associated roads, paths, boundary walls and services on and under land. This application is for phase 1 only consisting of 69 residential units and the crèche. Phase 2 shall be subject to a further application and shall consist of a further 54 units bringing the proposed overall total number of units across the site to 136 units (123 proposed plus 13 completed). Revised by significant further information consisting of; alterations to the design of House Type A1;alterations to the siting and orientation of Unit Nos. 1-4 The Park, Unit Nos. 1-4 The Court, Unit Nos. 1-2 The Crescent and Unit Nos. 23-24 The Crescent and the crèche / apartment building; alterations to Unit Nos. 1-4 The Park to become House Type A (Nos. 1-3 and A1 (No. 4) units in place of House Type B1; alterations to Unit Nos. 1, 17 and 24 The Crescent to become a House Type A1 in place of House Type B1; alterations to Unit Nos. 2, 18 and 23 The Crescent to become a House Type A in place of House Type B1; alteration to Unit No. 51 The Park to become House Type A in place of House Type A1; alterations to the layout of Unit No. 14 The Way House Type C; alterations to vehicular, pedestrian and cyclist routes; alterations to on-street visitor car parking and crèche set-down area; amended red line boundary to provide for public lighting on Geraldine Road; alterations to associated hard and soft landscaping works including boundary treatments; alterations to proposed infrastructural services provision and related pipework, and development works above and below ground; and the preparation and submission of a Natura Impact Statement.

Prusselstown Green , Athy , Co. Kildare

326m
2560966N/A26 Aug 2025

for the spreading of imported topsoil in specified areas of farmland to infill depressions to improve agricultural output and as a soil conditioner. Top-soil will be imported under section 27 by-product registration. Specific areas are marked on the drawings submitted with the application

Lands at Sawyerswood Farm , Athy , Co. Kildare.

685m
19764REFUSED4 Jul 2019

demolition of an existing agricultural shed {c. 120sqm gross floor area (GFA)} and the construction of a residential development comprising 97 No. residential units with 1 No. ancillary crèche facility, with a total GFA of c. 11,670sqm, consisting of: 40 No. 2 storey houses comprising: 4 No. 4 bed semi-detached units, c. 131.4sqm GFA; 34 No. 3 bed semi-detached units, ranging in size from c. 113.4sqm to c. 126.0sqm GFA; 2 No. 3 bed terraced units, c.110.0sqm GFA; 4 No. apartment blocks comprising 57 No. apartment/duplex units comprising; Block 01 (2-3 storey block, c. 1,411.1sqm GFA) comprising: 6 No. 2 bed units (with own-door access), ranging in size from c. 83.5sqm GFA to c. 87.6sqm GFA; 9 No. 2 bed apartment units, ranging in size from c. 79.5sqm GFA to c. 82.6sqm GFA; Block 01 comprises balconies on south-western and north-western elevations; Block 02 (3 storey block, c. 1,491.3sqm (GFA) comprising: 4 No. 2 bed units (with own-door access), c. 88.5sqm GFA: 2 No. 2 bed apartment units, ranging in size from c. 84.3sqm GFA to c. 94.0sqm GFA: 4 No. 3 bed duplex units (with own-door access), c. 135sqm GFA; 1 No. 3 bed duplex unit, c. 150.8sqm GFA; 1 No. 4 bed duplex unit, c. 149.7sqm GFA; Block 02 comprises balconies/terraces on southern, eastern and western elevations; Block 03 (3 storey block, c. 1,722.9sqm GFA) comprising: 5 No. 2 bed units (with own-door access), c. 88.5sqm GFA; 2 No. 2 bed apartment units, ranging in size from c. 84.3sqm GFA to c. 94.0sqm GFA; 5 No. 3 bed duplex units (with own-door access) c. 135sqm GFA; 1 No. 3 bed duplex unit, c.150.8sqm GFA; 1 No. 4 bed duplex unit, c. 149.7sqm GFA; Block 03 comprises balconies/terraces on north-eastern, south-western and north-western elevations; Block 04 (3 storey block, c. 1,950.3sqm GFA) comprising: 6 No. 2 bed units (with own-door access), c. 88.5sqm GFA; 2 No. 2 bed apartment units, ranging in size from c. 84.3sqm GFA to c. 94.0sqm GFA; 6 No. 3 bed duplex units (with own-door access), c. 135sqm GFA; 1 No. 3 bed duplex unit, c. 150.8sqm GFA; 1 No. 4 bed duplex unit, c. 149.7sqm GFA; Block 04 comprises balconies/terraces on north-eastern and south western elevations; 1 No. single storey crèche facility, c. 304sqm GFA with vehicular Pick-Up-Set-Down on Geraldine Road; The development will also consist of the provision of a new vehicular access from Geraldine Road; the provision of a new vehicular access from L40071 to serve future phase(s) of development; the provision of cycle path/footpath on

Geraldine Road and L40071 , Prusselstown Townland , Athy

874m
2360361CONDITIONAL7 Nov 2023

for to construct a dwelling house, wastewater treatment system, bored well, new splayed entrance and all associated site works

Tullygorey , Athy , Co Kildare

882m
22838CONDITIONAL11 Jul 2022

the installation of a 76.26kWp Rooftop Solar Photovoltaic Array on the roof of an existing hotel complex, consisting of 246No. photovoltaic panels mounted directly on the roof surfaces, with associated inverters and electrical service connections; a Biomass Plant Room, with 250kW Boiler and Flue, and a Biomass Fuel Store; and a circa 93kWp Ground Mounted Solar Photovoltaic Array consisting of 300No. photovoltaic panels, located behind the hotel complex on its associated northern field, with all associated inverters, electrical/energy service connections, and all associated services and works

Clanard Court Hotel , Dublin Road , Athy

933m
191270REFUSED14 Nov 2019

to construct a two storey dwelling house with attached garage, proprietary wastewater treatment system and sand polishing filter, new entrance and all associated and necessary site works

Gallowshill , Athy , Co. Kildare.

941m
20219CONDITIONAL5 Mar 2020

to construct a part single storey, part two storey dwelling, single storey garage, bored well, new waste water treatment system, new entrance and all associated site works

Tullygorey , Athy , Co. Kildare.

984m
2073CONDITIONAL31 Jan 2020

alterations and single storey extension to the Bar and Restaurant on the south/main entrance elevation and the provision of all other associated site excavation, infrastructural and site development works above and below ground

Clanard Court Hotel , Dublin Road , Athy

994m
1954CONDITIONAL23 Jan 2019

(a) Erection of 12 residential units comprising 4 No. 4 bedroom two storey semi-detached dwelling houses in two blocks (Block B) and 8 No. 3 bedroom two storey semi-detached dwelling houses in four blocks (Block A); (b) All site development works associated with the erection of these 12 residential units including footpaths, access roads, car parking, boundary walls, boundary fences, all associated landscaping areas and public lighting; (c) The vehicular and pedestrian access to this proposed new development shall be from the Geraldine Road along the access road serving the existing "Gallow Hill" housing estate located to east of this proposed development. All development to take place on lands

Shamrocklodge Townland , off Geraldine Road , Gallows Hill

1.0km
18856CONDITIONAL17 Jul 2018

alterations and a two-storey extension (310sqm) with eight en-suite bedrooms; a single storey office and beauty treatment room extension (84sqm) and a single storey chair store extension (23sqm) and the provision of all other associated site excavation, infrastructural and site development works above and below ground

Clanard Court Hotel , Dublin Road , Athy

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?