2240797
REFUSEDCork - Cork City Council
Proposed Development
Permission is sought for the construction of a residential development consisting of: (A) Demolition of existing derelict cottage and associated shed; (B) Construction of thirteen dwelling houses comprising of four no. two storey three-bedroom semi-detached dwelling houses, six no. two storey three-bedroom terraced dwelling houses and three no. two-storey four-bedroom detached houses; (C) Construction of a new vehicular entrance from Matthew Hill Road to provide access to the proposed residential development ; (D) Associated car parking, landscaping and all ancillary site development works.
View the full application file on the council's planning portal →Application Timeline
Application received
14 Jan 2022
Decision due
11 Jan 2023
Decision: REFUSED
11 Jan 2023
Appeal submitted
7 Feb 2023
Grant issued
21 Aug 2024
Appeal decided: REFUSED
21 Aug 2024
Application Details
- Location
- Site to the east of , Matthew Hill Road , at Lehenagh More
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
- Site Area
- 0.412 ha
Timeline
- Registration Date
- 14 January 2022
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 11 January 2023
- Grant Date
- 21 August 2024
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-315718-23
- Decision
- REFUSED
- Submitted
- 7 February 2023
- Decided
- 21 August 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for Retention of conversion of existing attached garage to living space, Permission for Retention of detached domestic garage and permission for the conversion of the existing attic space to living space and associated site works
Tarkeer House , Lehenagh , Togher
The construction of 1. A crèche facility, 2. A local shop with overhead apartment, & 3. A local doctors surgery and retail unit with 4 no. overhead apartments (part alteration and completion of development permitted under planning reg. ref no. 04/7674 and reg. ref no. 07/10893, as extended under planning reg.ref no’s 10/5240 and 13/4884 and 13/5025) and to provide carparking and to carry out all associated siteworks.
Manor Village West , Manor Farm Lehenaghbeg t/d , Togher
Alterations to dwelling house consisting of the construction of part single, part two storey rear & side extensions, elevational changes & associated site works.
15 Manor Village West , Manor Farm , Lehenaghbeg
Retention of first floor offices and permission for alterations to elevations to include first floor windows, fire escape stairs and doors at existing Industrial Unit/Warehouse.
Lehenaghmore , Togher , Co. Cork
Permission for construction of a single storey side extension and associated site works.
5 Manor Village East , Manor Farm , Lehenaghbeg
For planning permission. The development will consist of 1137m2 (450 No.) of roof mounted Solar PV Panels across 3 structures and 270m2 (112 no.) of ground mounted Solar PV Panels, at our premises.
Brughor House , Lehenaghmore , Togher
Retention of modifications to an existing light industrial development [constructed on foot of Planning Reg. No. 90/459] comprising (i) enclosure of open store with partition wall in southern section at first floor level, (ii) omission of open store stair access from ground floor manufacturing area, (iii) provision of alternative stair access on southern wall, and (iv) modifications and subdivision of floor space to provide for changing rooms, storage area and canteen. Permission is also sought for further internal modifications to the southern section at first floor level comprising relocation of stairs, provision of staff toilets/showers, circulation, storage, and meeting room space at their light industrial facility.
Lehenagh More , Togher , Co. Cork
Alterations to northern elevation to include removal of 1 no. roller door, provision of new entrance door complete with glass canopy, new ground and first floor windows and replacement signage;(ii) alterations to eastern elevation to include emergency exit, new ground and first floor windows: (iii) internal layout modifications comprising reconfiguration and refurbishment of back office and staff facilities at ground floor levels to include office and meeting spaces, toilets, elevator for disabled access, changing and canteen areas; (iv)installation of access hatch, fall arrest system and replacement of existing rooflights at roof level; (v) modifications to external services yard and parking areas to include new entrance to staff car park from the northeast, closure of vehicular linkage between the service yard and staff car park, reconfiguration of visitor car parking to northeast; (vi) removal of existing septic tank and installation of new sewage treatment system, and all associated ancillary development works, including landscaping at their light industrial facility.
Lehenagh More , Togher , Cork
Alterations to northern elevation to include removal of 1 No. Roller door, provision of new entrance door complete with glass canopy, new ground and first floor windows, and replacement signage; (ii) alterations to eastern elevation to include emergency exit, new ground and first floor windows; (iii) internal layout modifications comprising reconfiguration and refurbishment of back office and staff facilities at ground and first floor levels to include office and meeting spaces, toilets, elevator for disabled access, changing and canteen areas; (iv) installation of access hatch, fall arrest system and replacement of existing roof lights at roof level; (v) modifications to external services yard and parking areas to include new entrance to staff car park from the northeast, closure of vehicular linkage between the service yard and staff car park, reconfiguration of visitor car parking to northeast; (vi) removal of existing septic tank and installation of new sewage treatment system, and all associated ancillary development works, including landscaping at their light industrial facility
Lehenaghmore , Togher , Cork
For retention planning permission for the as constructed ground floor facilities layout and retention of the as constructed of a mezzanine floor over the ground floor staff facilities area. The mezzanine floor consists of 2 no. offices and associated office store at the north western corner of the existing Unit 6 Building, Westgate Business Park, Lehenaghmore, Togher, Cork. (Previusly granted permission Ref. No. 23/41843).
Unit 6 , Westgate Business Park , Lehenaghmore
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?