The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2241058

CONDITIONAL

Cork - Cork City Council

Proposed Development

Retention permission for development of this site at: 113 Ardcullen, Hollyhill, Co.Cork, T23H96V. The development consists of : Permission for the retention of (1) A single storey portico with lean-to roof to front of existing dwelling, and (2) A decorative stone cladding finish to front elevation at ground floor level to existing dwelling.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Apr 2022

  2. Decision: CONDITIONAL

    16 Jun 2022

  3. Decision due

    20 Jun 2022

  4. Grant issued

    28 Jul 2022

Application Details

Location
113 Ardcullen , Hollyhill , Co.Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork City Council

Timeline

Registration Date
26 April 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
16 June 2022
Grant Date
28 July 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

157m
2543984CONDITIONAL27 Jun 2025

Permission for the construction of an equipment storage building and all ancillary site development works.

Hollyhill Industrial Estate , Hollyhill , Cork

197m
1938803CONDITIONAL17 Oct 2019

Permission for the construction of a new substation building within the existing car park to cater for additional electric car charging points at the Hollyhill Industrial Estate

Hollyhill Industrial Estate , Tadhg Barry Road , Hollyhill

197m
1938804CONDITIONAL17 Oct 2019

Permission for modifications to the elevation of an existing building and all ancillary site development works at Hollyhill Industrial Estate, Tadhg Barry Road, Holyhill, Cork. The proposed modifications consist of upgrades to the elevation of an existing office building including the addition of new windows at ground and first floor levels facing into the existing service yard. Permission is also sought for the retention of modifications to two loading bays including a ground floor extension and associated modifications to the elevations.

Hollyhill Industrial Estate , Tadhg Barry Road , Holyhill

197m
1938283CONDITIONAL1 Mar 2019

Permission for the construction of 2 no. plant buildings, 2 no. oil tanks and all associated site development works at Hollyhill Industrial Estate, Tadhg Barry Road, Hollyhill, Cork. The proposed plant buildings will be located within the existing service yard and will accommodate back-up generators, a medium voltage switchroom and a control room.

Hollyhill Industrial Estate , Tadhg Barry Road , Hollyhill

224m
2341825CONDITIONAL9 Mar 2023

Permission for the demolition of an existing rear single-storey extension, removal of 2 no. existing sheds at the rear, construction of a rear two-storey extension including rooflights, a single-storey front extension, new windows to the southwest elevation, and all associated site development works.

No.1 Ardcullen Close , Hollyhill , Cork

229m
2139871CONDITIONAL1 Feb 2021

Permission for alterations within the existing lower service yard consisting of the construction of a 110.5m2 single storey extension with a rooftop plant enclosure to an existing production building and all ancillary site development works.

Hollyhill Industrial Estate , Tadgh Barry Road , Holyhill

273m
2139877CONDITIONAL2 Feb 2021

Permission is sought for the erection of 1. Lean-to and Roof Mounted Solar Panels to the South East Elevation of Existing Unit and associated service gantry. 2. New deck with perimeter railing to accommodate Geodome satellite receivers to Existing Roof of Existing Unit and associated site works.

Unit 8 , Hollyhill Industrial Estate , Hollyhill

273m
2443320N/A15 Oct 2024

permission for 1) the erection of two roof mounted insulated chimneys 2)two diesel storage tanks each with a capacity of 10000 litres 3)two water storage tanks each with the capacity of 10000 litres 4) one bund area consisting of a total capacity of 11000 litres. additionally permission is sought for the retention of 1) external plant room 2) a low height wall with fencing a service footpath and electrical and data groundworks on the northwest elevation 3) roof mounted solar panels on the southeast elevation 4) four roof mounted air inlet vents and minor alterations to the fenestration on the northeast elevation

Unit 8 , Hollyhill Industrial Estate , Hollyhill

291m
1737541CONDITIONAL18 Aug 2017

Permission is sought for a new pumping station and associated site works

Harbour View Road , Cork City

297m
1938947CONDITIONAL9 Dec 2019

Permission for an extension to the entrance lobby of an existing office building and all ancillary site development works.

Hollyhill Industrial Estate , Tadhg Barry Road , Holyhill

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?