2241269
CONDITIONALCork - Cork City Council
Proposed Development
Permission for retention is sought for a single-storey extension to the rear and side of an existing dwelling and a vehicular entrance from Station Road.
View the full application file on the council's planning portal →Application Timeline
Application received
15 Jul 2022
Decision: CONDITIONAL
7 Sept 2022
Decision due
8 Sept 2022
Grant issued
19 Oct 2022
Application Details
- Location
- 1 Station Road , Ballincollig , Co.Cork
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork City Council
- Site Area
- 0.0454 ha
Timeline
- Registration Date
- 15 July 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 7 September 2022
- Grant Date
- 19 October 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The demolition of existing sheds and construction of one apartment block consisting of 6 no. units, bike store, bin store, private amenity space, landscaping, and all associated development works. The height of the apartment block is 4 storeys, with the top storey setback.
Chapel Lane Row , Off The Square , Ballincollig
Alterations to existing front elevations including the provision of a new shop front to the ground floor façade to existing restaurant premises.
No. 3 Main Street , Ballincollig , Co. Cork
Demolish existing dwellinghouse and construct a funeral home with first floor storage area, new site entrance, car park and associated siteworks and drainage
Station Road , Ballincollig , Co. Cork
Permission for alterations to the front elevation of an existing building including widening an existing ground floor window , construct new shop front and new signage and all associated siteworks.
4 Main Street , Ballincollig
Permission...for a new accessible entrance, new painted timber shopfronts with external signage and illumination. Signage to be individually illuminated raised lettering to shop signs and illuminated projecting signs. Also, minor alterations to public path on Main Street to create external accessible level entrance at the new entrance door and all ancillary works.
Corner of Main Street and , Station Road Ballincollig , Co.Cork
Permission for the retention and completion of a 2 storey rear extension, permission for the conversion of the existing single dwelling to 2 no. 1-bed apartments, including changes to the front and rear elevations and all associated site works.
No.6 The Square , (Previously No.2 The Square) , Ballincollig
Permission for the installation of an air conditioning system that includes the installation of 2 no. external condenser units to the west of the building within a proposed grated steel protective enclosure. The installation of 2 no. wall mounted units to the internal façade of the west elevation as well as the installation of 2 no. proposed ceiling cassettes for the main area to the east and north of the building and all associated internal alterations to suit, and all ancillary site development works at Starbucks, Unit 34, former Coach House (protected structure), Castlewest Shopping Centre, the former Murphy's Barracks, Main Street, Ballincollig, Co. Cork. Registered protected structure number PS1232.
Starbucks Unit 34 , Castlewest Shopping Centre , Main Street Ballincollig
Permission for change of use of existing ground floor retail unit and first floor office unit to fitness studios along with new shopfront signage.
Units 25 and 25A , Castlewest Shopping Centre , Ballincollig
For permission at Unit 13, Castle West Shopping Centre, Ballincollig, Cork. The development will consist of the change of use of retail to restaurant/take-away (for consumption on and off the premises). Involving (1) The preparation of kitchen (2) New serving counter (3) New dining seating on ground and first floors (4) New accessible staff WC and (5) All site ancillary works.
Unit 13 , Castle West Shopping Centre , Ballincollig
Permission for the construction of a residential development containing 16 no. apartments at Bakers Street, Ballincollig, Cork, comprising eight no. 1 bedroom apartments and eight no. 2 bedroom duplex units in a three block arrangement of three no. storeys as follows: (A) 3 storey apartment Block A to contain 8 units comprising 4 no. 1 bedroom apartments and 4 no. 2 bedroom duplex apartments (B) 3 storey Apartment Block B to contain 4 units comprising 2 no. 1 bedroom apartments and 2 no. 2 bedroom duplex apartments, (C) 3 storey Apartment Block C to contain 4 units comprising 2 no. 1 bedroom apartments and 2 no. 2 bedroom duplex apartments with all apartments in the proposed scheme all with their own private external balcony/terrace, (D) New site vehicular and pedestrian entrances off Baker Street with circulation roadway and footpaths and 10 no. car parking spaces, (E) External bikes parking and enclosed bin storage area, (F) Hard and soft landscaping including open space and boundary treatments and all associated site drainage, utilities and site services and associated site works.
Baker Street , Ballincollig , Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?