22412
N/ATipperary - Tipperary County Council
Proposed Development
bank protection and stabilisation works on both sides of the bypass channel of the River Suir from the footbridge at the Commons/the Green to the confluence with the main channel. A Natura Impact Statement (NIS) will be submitted with this planning application
View the full application file on the council's planning portal →Application Details
- Location
- Commons , Ardfinnan , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 14 June 2022
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
bank protection and stabilisation works on both sides of the bypass channel of the River Suir from the footbridge at the Commons/the Green to the confluence with the main channel. A Natura Impact Statement (NIS) will be submitted with this planning application
Commons , Ardfinnan , Co. Tipperary
The development will consist of works to protect and stabilise the banks of the existing by-pass channel of the River Suir, and will comprise: (1) construction of rock armour along a linear stretch of 2.5m on both the eastern and western banks of the channel, adjacent to the abutments of the existing footbridge; (2) construction of rock armour along a linear stretch of 30m on the eastern bank of the channel (to the rear of the existing tennis courts); (3) construction of rock armour along a linear stretch of 30m on the western bank of the channel (immediately before the channel meets the River Suir); and, (4) all ancillary and temporary works including the provision of temporary accessways. A Natura Impact Statement (NIS) will be submitted with this Planning Application.
The Green Ardfinnan in the townlands of Magherareagh and Commons , Ardfinnan , Co. Tipperary
demolition of former creamery building and construction of new playground, including associated site boundary and site development works
Main Street , Ardfinnan , Co. Tipperary
a) the change of use of existing commercial premises (hair dressers) to domestic use (dwelling) and b) associated site works
Main Street , Ardfinnan , Co Tipperary
a) change of use of existing commercial premises (hair dressers) to domestic use (dwelling), and b) associated site works
Main Street , Ardfinnan , Co Tipperary
the proposed development consisting of the following, change of use of existing restaurant to retail (pharmacy) use, omitting the first floor residential unit, the proposed erection of a single storey rear extension, minor external & internal alterations, the erection of a new shopfront & associated signage, the erection of a projecting illuminated LED green cross sign together with all associated site works
Magherareagh , Main Street , Ardfinnan
alterations to as constructed rear ground floor extension of the Public House from that as granted Planning Permission under Planning reference number 18/600664. And for Permission to retain metal flue on the rear elevation of living accommodation over flat roof and for Permission to provide ventilation and extract equipment from the kitchen of the Public House on the external wall and flat roof, all to the rear
Main Street , Kilballygorman , Ardfinnan Clonmel
alterations to the front elevation which consists of the provision of separate access door to first floor living accommodation with a new shop front to both Public House and Off License and alterations to the rear external first floor elevation and an extension to the rear ground floor for the provision of storage. Permission is also sought for internal alterations and layout of the Public House and for internal alterations and layout to living accommodation on the first floor
Main Street , Killballygorman , Ardfinnan
construction of a two-storey extension for stairwell and lift (to north east)
Former Creamery Site , 23 Main Street , Ardfinnan Co. Tipperary
the replacement of the existing garage structure with a new domestic garage and all associated site works
The Boreen , Main Street , Ardfinnan
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?