The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

22421

N/A

Offaly - Offaly County Council

Proposed Development

THE CONSTRUCTION OF A REAR SINGLE STOREY EXTENSION TO THE EXISTING DWELLING, CONVERSION AND ALTERATIONS TO THE EXISTING 2 STOREY ADJOINING SIDE AND REAR DOMESTIC SHEDS TO FORM PART OF THE EXISTING DWELLING, PROPOSED NEW WINDOWS AND DOOR OPENINGS TO THE FRONT, SIDE AND REAR FACADE ELEVATIONS OF EXISTING DWELLING AND ADJOINING SHEDS, ROOF REFURBISHMENT TO EXISTING REAR SHED AND ALL ASSOCIATED SITE WORKS TO COMPLETE THE DEVELOPMENT

View the full application file on the council's planning portal →

Application Details

Location
SYNGEFIELD , CLONOGHILL UPPER , BIRR CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council

Timeline

Registration Date
18 August 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22466CONDITIONAL8 Sept 2022

THE CONSTRUCTION OF A REAR SINGLE STOREY EXTENSION TO THE EXISTING DWELLING, CONVERSION AND ALTERATIONS TO THE EXISTING 2 STOREY ADJOINING SIDE AND REAR DOMESTIC SHEDS TO FORM PART OF THE EXISTING DWELLING, PROPOSED NEW WINDOWS AND DOOR OPENINGS TO THE FRONT, SIDE AND REAR FAÇADE ELEVATIONS OF EXISTING DWELLING AND ADJOINING SHEDS, ROOF REFURBISHMENT TO EXISTING REAR SHED AND ALL ASSOCIATED SITE WORKS TO COMPLETE THE DEVELOPMENT. THE PROPOSED DEVELOPMENT IS LOCATED WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE (RPS 53-373)

SYNGEFIELD CLONOGHIL UPPER , BIRR , CO. OFFALY

346m
25127N/A12 Dec 2025

THE INSTALLATION OF A ROOFTOP SOLAR PHOTOVOLTAIC ARRAY (1,339.9 SQ.M) ON EXISTING FACTORY BUILDINGS AND ALL ASSOCIATED ELECTRICAL INFRASTRUCTURE

BIRR ENTERPRISE CENTRE SYNGEFIELD , BIRR CO.OFFALY , R42EK09

346m
2610N/A6 Feb 2026

THE INSTALLATION OF A ROOFTOP SOLAR PHOTOVOLTAIC ARRAY ( 1,339.3 SQ.M ) ON EXISTING FACTORY BUILDINGS AND ALL ASSOCIATED ELECTRICAL INFRASTRUCTURE. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

BIRR ENTERPRISE CENTRE SYNGEFIELD , BIRR , CO.OFFALY

346m
2616CONDITIONAL23 Feb 2026

THE INSTALLATION OF A ROOFTOP SOLAR PHOTOVOLTAIC ARRAY (RED III) (1,339.3 SQ.M) ON EXISTING FACTORY BUILDINGS AND ALL ASSOCIATED ELECTRICAL INFRASTRUCTURE. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE RENEWABLE ENERGY DIRECTIVE III ( DIRECTIVE (EU) 2023/2413) AND IT IS IMPORTANT TO NOTE THAT THE PLANNING APPLICATION MAY BE SUBJECT TO SECTION 34D OF THE PLANNING AND DEVELOPMENT ACT 2000, AS AMENDED. WHEN A NOTICE ISSUES IN ACCORDANCE WITH SECTION 34D(B), THE PROVISIONS OF ARTICLE 26A OF THE PLANNING AND DEVELOPMENT REGULATIONS 2001 TO 2025 SHALL APPLY

BIRR ENTERPRISE CENTRE SYNGEFIELD , BIRR , CO.OFFALY

346m
263N/A22 Jan 2026

THE INSTALLATION OF A ROOFTOP SOLAR PHOTOVOLTAIC ARRAY (1,339.3 SQ.M) ON EXISTING FACTORY BUILDINGS AND ALL ASSOCIATED ELECTRICAL INFRASTRUCTURE

BIRR ENTERPRISE CENTRE , SYNGEFIELD BIRR , CO.OFFALY

367m
2360181CONDITIONAL13 Nov 2023

Extended Car Parking Area And All Associated Site Works, Retention Permission For Loading Bay And Canteen Facility And All Associated Site Works. Permission To Extend Existing Loading Bay And New Loading Bay

Syngefield , Birr , Co. Offaly

368m
23363N/A16 Aug 2023

LOADING BAY AND CANTEEN FACILITY. PERMISSION TO EXTEND EXISTING LOADING BAY AND NEW LOADING BAY AND ALL ASSOCIATED SITE WORKS

SYNGEFIELD , BIRR , CO. OFFALY

392m
20183CONDITIONAL20 May 2020

ADDITION AND ALTERATIONS TO EXISTING DWELLING HOUSE WHICH WILL INTEGRATE THE MAIN DWELLING HOUSE WITH THE DETACHED RESIDENTIAL UNIT TO FORM ONE DWELLING HOUSE AND ALL ANCILLARY SITE WORKS

CLONOGHIL UPPER , SYNGEFIELD , BIRR CO OFFALY

411m
22384CONDITIONAL3 Aug 2022

MODIFICATIONS TO EXISTING DWELLING HOUSE AND CONSTRUCT A REAR EXTENSION AND ANCILLARY WORKS

ELM PARK , SYNGEFIELD , BIRR CO. OFFALY

438m
20299CONDITIONAL16 Jul 2020

DOMESTIC GARAGE/FUEL SHED AND ALL ANCILLARY SITE WORKS

CLONOGHILL UPPER SYNGEFIELD , BIRR , CO. OFFALY

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?