22444

CONDITIONAL

Offaly - Offaly County Council

Proposed Development

(I) THE EXISTING 80 METRE METEOROLOGICAL MAST, WHICH WAS ERECTED AS EXEMPTED DEVELOPMENT IN ACCORDANCE WITH CLASS 20A, SCHEDULE 2, OF THE PLANNING AND DEVELOPMENT REGULATIONS 2001 (AS AMENDED), AND ALL ANCILLARY INFRASTRUCTURE AND ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS; AND (II) PERMISSION TO INCREASE THE HEIGHT OF THE EXISTING METEOROLOGICAL MAST FROM 80 METRES TO A HEIGHT OF 100 METRES. THE OPERATIONAL LIFETIME OF THE PROPOSED DEVELOPMENT WILL BE UP TO FIVE YEARS. THIS PLANNING APPLICATION IS ACCOMPANIED BY AN APPROPRIATE ASSESSMENT SCREENING REPORT

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Aug 2022

  2. Further information requested

    21 Oct 2022

  3. Further information received

    31 Jan 2023

  4. Decision due

    27 Feb 2023

  5. Decision: CONDITIONAL

    27 Feb 2023

  6. Grant issued

    5 Apr 2023

Application Details

Location
GALROS WEST FIVEALLEY , BIRR , CO. OFFALY
Applicant
N/A
Application Type
RETENTION
Planning Authority
Offaly County Council
Site Area
3.14 ha

Timeline

Registration Date
29 August 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 February 2023
Grant Date
5 April 2023
Permission Expires
4 April 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
22401N/A10 Aug 2022

(I) THE CONTINUED OPERATION OF THE EXISTING 80 METRE METEOROLOGICAL MAST, WHICH WAS ERECTED AS EXEMPTED DEVELOPMENT IN ACCORDANCE WITH CLASS 20A, SCHEDULE 2, OF THE PLANNING AND DEVELOPMENT REGULATIONS 2001 (AS AMENDED), AND ALL ANCILLARY INFRASTRUCTURE AND ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS; AND (II) THE INCREASE IN HEIGHT OF THE EXISTING METEOROLOGICAL MAST FROM 80 METRES TO A HEIGHT OF 100 METRES. THE OPERATIONAL LIFETIME OF THE PROPOSED DEVELOPMENT WILL BE UP TO FIVE YEARS. THIS PLANNING APPLICATION IS ACCOMPANIED BY AN APPROPRIATE ASSESSMENT SCREENING REPORT

GALROS WEST , COUNTY OFFALY

1.2km
19485CONDITIONAL11 Oct 2019

CONSTRUCTION OF A NEW DWELLING HOUSE, FORM NEW ENTRANCE, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA & ALL ASSOCIATED SITE WORKS

GALROS EAST , FIVEALLEY , BIRR CO OFFALY

1.4km
17403CONDITIONAL13 Oct 2017

ADDITION & ALTERATIONS TO EXISTING DWELLING HOUSE, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS

BALLYSLEVIN , GARBALLY , BIRR

1.6km
18230REFUSED30 May 2018

THE INSTALLATION OF APPROXIMATELY 12.5KM OF 38KV ELECTRICITY TRANSMISSION LINE FROM THE PERMITTED (WIND FARM) SUBSTATION (OFFALY COUNTY COUNCIL PLANNING REGISTER REFERENCE 14/188 & AN BORD PLEANALA REFERENCE PL19.244053) IN THE TOWNLAND OF STONESTOWN, COUNTY OFFALY TO THE EXISTING ELECTRICITY SUBSTATION IN THE TOWNLAND OF CLONDALLOW, COUNTY OFFALY. THE TRANSMISSION LINE WILL COMPRISE APPROXIMATELY 8.5KM OF UNDERGROUND LINE AND APPROXIMATELY 3.7KM OF OVERHEAD LINE. UNDERGROUND INFRASTRUCTURE WILL BE LOCATED WITHIN PRIVATE LANDS AND WITHIN THE PUBLIC ROADS NUMBERED N62, R439 AND THE L70152; WILL BE INSTALLED IN EXCAVATED TRENCHES OF APPROXIMATELY 1.2M IN DEPTH AND WILL INCLUDE ASSOCIATED UNDERGROUND DUCTING, JOINT BAYS, COMMUNICATION CHAMBER BAYS, SHEATH LINK BOXES AND INSPECTION CHAMBERS; DIRECTIONAL DRILLING AT 1 NO. RAILWAY CROSSING ALONG THE N62, AND ALL ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS. OVERHEAD INFRASTRUCTURE WILL CONSIST OF 3 NO. POWERLINES SUSPENDED FROM WOODEN POLES WITH A MAXIMUM HEIGHT OF 16 METRES, AND ALL ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS. THIS PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) / ENVIRONMENTAL IMPACT STATEMENT (EIS) WHICH INCLUDES AN ASSESSMENT OF THE LIKELY IMPACTS OF THE PROPOSED DEVELOPMENT, AS A WHOLE AND IN COMBINATION WITH THE RELEVANT OFF-SITE OR SECONDARY DEVELOPMENTS WHICH WILL OCCUR AS A DIRECT RESULT OF THE PROPOSED DEVELOPMENT, INCLUDING THE WIND FARM DEVELOPMENT PERMITTED PURSUANT TO OFFALY COUNTY COUNCIL PLANNING REGISTER REFERENCE 14/188 & AN BORD PLEANALA REFERENCE PL19.244053

ACROSS THE TOWNLANDS OF STONESTOWN KILCAMIN CRANCREAGH DERRINLOUGH CLOONEEN WHIGSBOROUGH , GALROS EAST GALROS WEST CUSH BOOLINARIG BIG CONSPARK BALLAGHANOHER ROSS AND CLONDALLOW , CO OFFALY

1.8km
22548N/A21 Oct 2022

AN EXTENSION TO THE EXISTING DWELLING, ALTERATIONS TO THE EXISTING DWELLLING AND ALL ASSOCIATED SITE WORKS

BOOLINARIG BIG , BIRR , CO. OFFALY

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?