the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application

View the full application file on the council's planning portal →

Application Details

Location
Woodstock and Kereen Lower , Cappoquin , Co. Waterford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council

Timeline

Registration Date
27 May 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22695N/A5 Aug 2022

for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application

Kereen Lower , Cappoquin , Co. Waterford

0m
22492N/A8 Jun 2022

PERMISSION for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application

Woodstock and Kereen Lower , Cappoquin , Co. Waterford

0m
2460345CONDITIONAL24 Jun 2024

for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application.

Woodstock & Kereen Lower , Cappoquin , Co. Waterford

0m
22739REFUSED22 Aug 2022

for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application

Woodstock and Kereen Lower , Cappoquin , Co. Waterford

81m
17133N/A27 Feb 2017

to extend the infill part of the Exhausted Quarry with Inert Material and an area to recycle construction materials

Kereen Lower , Cappoquin , Co. Waterford

81m
17160CONDITIONAL13 Mar 2017

to extend the infill part of the Exhausted Quarry with Inert Material and an area to recycle construction materials

Kereen Lower , Cappoquin , Co. Waterford

81m
1775N/A6 Feb 2017

to extend the infill part of the Exhausted Quarry with Inert material and an area to recycle construction materials. The activity involved an activity that requires a Waste Facility Permit.

Kereen Lower , Cappoquin , Co. Waterford

81m
22133REFUSED23 Feb 2022

Extension of Duration to Planning File 17/160 to extend the infill part of the exhausted quarry with inert material and an area to recycle construction materials. The activity involves an activity that requires a waste facility permit

Kereen Lower , Cappoquinn , Co. Waterford

273m
2360610CONDITIONAL14 Dec 2023

for the construction of a detached timber-frame dwelling, wastewater bio treatment tank and raised soil polishing percolation area, potable well, vehicular entrance and all associated site works

Woodstock , Cappoquin , Co. Waterford

273m
2560809CONDITIONAL14 Nov 2025

the minor amendments to development permitted under ref. no 23/60610 and comprises the replacement of a detached timber-frame dwelling with a detached block-work dwelling, including ancillary localised site works. The residential development permitted under ref. no. 23/60610 remains otherwise unchanged.

Woodstock , Cappoquin , Co. Waterford

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?