The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2247

REFUSED

Galway - Galway County Council

Proposed Development

to erect dwelling house, domestic garage, wastewater treatment system, polishing filter and all associated services. A Natura Impact Statement and Construction Environmental Management Plan will be submitted to the planning authority with the application.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Jan 2022

  2. Decision: REFUSED

    16 Mar 2022

  3. Decision due

    17 Mar 2022

Application Details

Location
Killeany ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.347 ha
Floor Area
105.5 sq m
Residential Units
1

Timeline

Registration Date
21 January 2022
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
16 March 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
201454REFUSED7 Oct 2020

to erect dwelling house, domestic garage, wastewater treatment system, polishing filter and all associated services. Gross floor space of proposed works: 105.50 (house), 59.60 (garage)

Killeany ,

0m
2260686REFUSED6 Jul 2022

sought to erect dwelling house, domestic garage, wastewater treatment system, polishing filter and all associated services.. Gross floor area of proposed works 105.50sqm (dwelling house) and 59.60sqm (domestic garage)

Cill Éinne ,

282m
17490CONDITIONAL13 Apr 2017

chun síneadh dhá stór ar airde a thógail ag cul an ti, síneadh aon stór a thógail ag taobh tí, úrlar nua (seomra codladh) a chuir leis an garáiste, agus an garáiste a athrú isteach már chúid den teach agus gach seirbhís láithreáin a bhaineann leis. (Spás urláir comhlán na n-oibreacha beartaithe: 93.5 sqm.)

Cill Einne Td. Inis Mór ,

679m
17234CONDITIONAL23 Feb 2017

for development within the grounds of Ostán Oileáin Arainn,Rónáin. The development will comprise of 40 number detached freestanding bedroom chalets, footpaths and access ways, service connections to existing hotel, sewerage system to connect to existing facility, landscaping together with all ancillary requisite works. Gross floor space of proposed works: 996sqm

Cill Rónáin ,

729m
24116CONDITIONAL29 Apr 2024

to replace the existing marquee function room with a new function room as a permanent structure upon the same footprint, the development will include toilets, bar, connections to existing services, (N.B. the effluent loading to the existing WWTP will be unchanged) including all required ancillary works. Gross floor space of proposed works: 370 sqm

Cill Éinne , Ostan Arann Killeany , Aran Islands

761m
2461800CONDITIONAL20 Dec 2024

Séard a bheidh sa bhforbairt seo ná teach cónaithe (213.m²) le 4 sheomra leapa agus Garáiste (58.41m²) a thógail chomh maith le, córas séarachais, ait siothlaithe, agus don obair agus seirbhisí eile atá bainteach leis an suíomh. Tá Ráiteas Tionchair Natura a chur isteach leis an Iarratas seo

Cill Éinne , Inis Mór , Co. Na Gaillimhe

795m
191423REFUSED13 Sept 2019

chun teach cónaithe agus córas séarachais a thógáil. Spás urláir comhlán n n-oibreacha beartaithe: 172 sqm

Cill Éinne (Killeany) ,

925m
212008REFUSED28 Oct 2021

chun (1) méaduithe aon stóir a thógáil ag Halla Rónáin agus (2) rampa rochtana seirbhíse/geata iontrála a fhoirgniú maraon le hoibreacha gaolmhara. Spás urláir comhlán na n-oibreacha beartaithe: 67.80 sqm.

Cill Éinne ,

935m
20555CONDITIONAL6 May 2020

le haghaidh insealbhú 20 painéal fótavoltach gréine mar aon leis na hoibreacha a bhaineann leo ar an bhfoirgneamh ag Halla Rónáin. Spás urláir comhlán na n-oibreacha beartaithe i; 33.2sqm. Spás urláir comhlán na hoibre atá le coinneáil i; 470sqm

Cill Rónáin Inis Mór ,

983m
21256UNCONDITIONAL26 Feb 2021

1. Athraithe ar sheanteach cónaithe atá ann cheana féin, san áireamh beidh an díon á árdú le seomraí a chur san áiléar agus síneadh a dhéanamh ar chúl a bhéas stór go leith ar airde le húsáid mar sheomra fáilte, seomra bia agus seomra léachtaí/cluichí 2. Ceithre fhoirgneamh nua a thógáil, stor go leith ar airde mar aonaid chónaithe turasóireachta chomh maith le córas cóireála dramhuisce, ionad síothlaithe, suíomh páirceála agus oibreacha uile seirbhíse agus suímh. Gross floor space of proposed works: 1073.4sqm

Killeany ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?