The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

22490

N/A

Clare - Clare County Council

Proposed Development

to build a new dwelling, install a wastewater treatment system & all other associated site and ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Jun 2022

  2. Application withdrawn

    13 Sept 2022

  3. Decision due

    26 Jan 2023

Application Details

Location
Ardnacraa , Liscannor , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Floor Area
260 sq m
Residential Units
1

Timeline

Registration Date
2 June 2022
Status
WITHDRAWN
Decision
N/A
Decision Due
26 January 2023
Withdrawn
13 September 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
22823N/A15 Sept 2022

to build a new dwelling house, install a sewerage treatment system & all other associated site and ancillary works

Ardnacraa , Liscannor , Co. Clare

8m
23331N/A8 Jun 2023

to build a dwelling house, install a wastewater treatment system & all other associated site and ancillary works

Ardnacraa , Liscannor , Co Clare

8m
23369CONDITIONAL27 Jun 2023

to build a dwelling house, install a wastewater treatment system & all other associated site and ancillary works

Ardnacraa , Liscannor , Co Clare

119m
19644CONDITIONAL9 Aug 2019

to modify the design of the extension to cottage as granted under Planning Ref. No. P19-61 to include for the re-orientation and modification of the bedroom wing on the north side of the extension

Ardnacraa , Liscannor , Co. Clare

119m
1961CONDITIONAL4 Feb 2019

to restore existing cottage, remove existing sheds and construct new addition with proprietary waste treatment system and associated site works

Ardnacraa , Liscannor , Co. Clare

313m
18600CONDITIONAL23 Jul 2018

permission for development and permission for development, the RETENTION permission for development consists of the constructed two no. animal feed silos and partially constructed slatted unit and associated site works. The permission for development consists of the completion of a partially constructed slatted unit and associated site works.

Ardnacraa , Liscannor , Co. Clare

316m
2560159CONDITIONAL31 Mar 2025

for the refurbishment of an existing house, demolition of an existing garage and shed, construction of a two storey garage/utility/bedroom extension and all associated site works

Adrnacraa Tld. , Liscannor , Co. Clare V95 W6R7

355m
18193CONDITIONAL12 Mar 2018

to a) RETAIN demolition of existing dwelling house structure and to b) RETAIN construction of works as carried out in modified form and for PERMISSION to c) Complete construction of works as proposed in modified form and all in accordance with and consistent with the original design granted planning permission under Planning Reference P16-647

Ballysteen Tld , Liscannor , Co. Clare

364m
19407CONDITIONAL21 May 2019

to demolish an existing garage, to refurbish the existing House and Bed and Breakfast with 2 no. guest bedrooms and 2 no. studio guest bedrooms for short term letting, to construct an entrance / store extension to the Existing House, to decommission the existing septic tank and to construct a new proprietary wastewater treatment system and associated site works

Ardnacraa Tld , Liscannor , Co. Clare

364m
18194CONDITIONAL12 Mar 2018

for a) to refurbish an existing house and construct a loft floor dormer extension, b) to construct a living / dining / kitchen / car port extension to the rear of the existing house, c) to demolish an existing garage, and d) To decommission an existing septic tank and to construct a new proprietary wastewater treatment system and associated site works

Ardnacraa Ltd , Liscannor , Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?