The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2250090

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

EXTENSION TO EXISTING DWELLING HOUSE COMPRISING OF A GAMES ROOM AND DOMESTIC GAMES

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Jan 2022

  2. Decision: CONDITIONAL

    10 Mar 2022

  3. Decision due

    23 Mar 2022

  4. Grant issued

    19 Apr 2022

Application Details

Location
25 ASHGROVE MANOR , ALTAGHDERRY , KILLEA LIFFORD PO
Applicant
N/A
Application Type
RETENTION
Planning Authority
Donegal County Council
Site Area
0.053 ha

Timeline

Registration Date
27 January 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 March 2022
Grant Date
19 April 2022
Permission Expires
18 April 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
2152453N/A9 Dec 2021

EXTENSIONS TO EXISTING DWELLING HOUSE COMPRISING OF A GAMES ROOM AND DOMESTIC GARAGE

25 ASHGROVE MANOR , ALTAGHDERRY , KILLEA

133m
2350339CONDITIONAL16 Mar 2023

CONSTRUCTION OF A SMALL EXTENSION TO THE SIDE OF EXISTING DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES

470 KILLEA COTTAGES , ALTAGHDERRY KILLEA , CARRIGANS LIFFORD PO

142m
2051569CONDITIONAL21 Oct 2020

EXISTING SINGLE STOREY EXTENSION TO THE SIDE OF DWELLING ALONG WITH ALL ASSOCIATED SITE WORKS

NO. 36 ASHGROVE MANOR ALTAGHDERRY , KILLEA , LIFFORD PO

182m
1850112N/A31 Jan 2018

(A) RETENTION OF EXISTING CONCRETE RETAINING WALL STRUCTURE AND TIMBER FENCE (B) FILING IN OF EXISTING EXCAVATED LANDS TO PROVIDE FOR A YARD AND (C) ALL ASSOCIATED SITE WORKS

ALTAGHADERRY , KILLEA , LIFFORD PO

182m
1850209REFUSED12 Feb 2018

(A) RETENTION OF EXISTING CONCRETE RETAINING WALL STRUCTURE AND TIMBER FENCE, (B) FILLING IN OF EXISTING EXCAVATED LANDS TO PROVIDE FOR A YARD AND (C) ALL ASSOCIATED SITE WORKS

ALTAGHADERRY , KILLEA , LIFFORD PO

191m
1950515CONDITIONAL12 Apr 2019

(1) REMOVAL OF UNAUTHORISED WALL AND CONSTRUCTION OF AN EXTENSION TO THE SIDE ELEVATION OF EXISTING PREMISES KNOWN AS 'THE ALT BAR', AND (2) RETENTION OF SMOKING AREA

ALTAGHDERRY , KILLEA , LIFFORD P.O.

285m
2450183UNCONDITIONAL22 Jul 2024

COMPLETION OF AN UNFINISHED DEVELOPMENT CONSISTING OF (A) REMOVAL OF 7 EXISTING FOOTINGS ON SITE, (B) COMPLETION OF 3 DETACHED FOOTINGS, (C) CONSTRUCTION OF 4 SINGLE STOREY DWELLINGS, (D) CONSTRUCTION OF 8 SEMI DETACHED DWELLINGS AND (E) CONSTRUCTION OF 15 DETACHED DWELLINGS AND COMPLETION OF ALL EXISTING UNFINISHED DRIVEWAYS, FOOTPATHS, LAMPSTANDS, SEWER PIPEWORK, SURFACE WATER PIPEWORK AND THE MAINS PIPEWORK AND ALL OTHER ANCILLARY WORK INCLUDING LANDSCAPING OF OPEN SPACES

KILDRUM UPPER , KILLEA , LIFFORD PO

286m
1851931CONDITIONAL20 Dec 2018

COMPLETION OF AN UNFINISHED DEVELOPMENT CONSISTING OF (A) REMOVAL OF 7 EXISTING FOOTINGS ON SITE, (B) COMPLETION OF 3 DETACHED FOOTINGS ON SITE NO'S 6,7 AND 9, (C) CONSTRUCTION OF 4 SINGLE STOREY DWELLINGS, (D) CONSTRUCTION OF 8 SEMI DETACHED DWELLINGS AND (E) CONSTRUCTION OF 15 DETACHED DWELLINGS AND COMPLETION OF ALL EXISTING UNFINISHED DRIVEWAYS, FOOTPATHS, LAMPSTANDS, SEWER PIPEWORK, SURFACE WATER PIPEWORK AND THE MAINS PIPEWORK AND ALL OTHER ANCILLARY WORK INCLUDING LANDSCAPING OF OPEN SPACES

KILDRUM UPPER , KILLEA , LIFFORD PO

433m
2050811N/A22 Jun 2020

(1) NEW INLET WORKS (2) 2 NO. PRIMARY SETTLEMENT TANKS (3) STORMWATER HOLDING TANK AND STORMWATER RETURN PUMPING STATION (4) 3 NO. ROTATING BIOLOGICAL CONTACTOR (RBC) UNITS (5) 2 NO. FINAL SETTLEMENT TANKS (6) CONSTRUCTION OF A NEW ADMINSTRATION BUILDING (7) INSTALLATION OF SLUDGE STORAGE TANK (8)ERECTION OF A NEW SECURITY FENCE (9) DEVELOPMENT OF SITE ROADS (10) DEMOLITION OF THE EXSTING ADMINSTRATION BUILDING (11) DECOMMISSIONING OF THE EXISTING SECONDARY TREATMENT UNITS (12) DECOMMISSIONING OF THE EXSTING INLET WORKS. A NATURA IMPACT STATEMENT WILL ACCOMPANY THIS APPLICATION

ALTAGHADERRY , KILLEA , LIFFORD PO

433m
2050982CONDITIONAL22 Jul 2020

UPGRADE WORKS AT KILLEA WASTEWATER TREATMENT PLANT AS FOLLOWS: (1) NEW INLET WORKS (2) 2 NO. PRIMARY SETTLEMENT TANKS (3) STORMWATER HOLDING TANK AND STORMWATER RETURN PUMPING STATION (4) ROTATING BIOLOGICAL CONTRACTOR (RBC) UNITS (5) 2 NO. FINAL SETTLEMENT TANKS (6) NEW ADMINISTRATION BUILDING (6) SLUDGE STORAGE TANK (7) NEW SECURITY FENCE (8) SITE ROADS (9) DEMOLITION OF THE EXISTING ADMINISTRATION BUILDING (10) DECOMMISSIONING OF THE EXISTING SECONDARY TREATMENT UNITS (11) DECOMMISSIONING OF THE EXISTING INLET WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

ALTAGHADERRY , KILLEA , LIFFORD PO

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?