2250091
N/ADonegal - Donegal County Council
Proposed Development
CONSTRUCTION OF A NEW DWELLING HOUSE WITH A WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER WITH ALL REQUIRED SITE WORKS
View the full application file on the council's planning portal →Application Details
- Location
- TOOME , LETTERMACWARD , CO DONEGAL
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.4 ha
- Floor Area
- 123 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 27 January 2022
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF A NEW DWELLING HOUSE WITH A WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER WITH ALL REQUIRED SITE WORKS
TOOME , LETTERMACAWARD , CO DONEGAL
CONSTRUCTION OF A NEW DWELLING HOUSE WITH A WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER WITH ALL REQUIRED SITE WORKS
TOOME , LETTERMACWARD , CO DONEGAL
CONSTRUCTION OF A NEW DWELLING HOUSE WITH A WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER WITH ALL REQUIRED SITE WORKS
TOOME , LETTERMACWARD , CO DONEGAL
CONSTRUCTION OF A THREE BEDROOM DWELLING HOUSE WITH A WASTE WATER TREATMENT SYSTEM WITH ASSOCIATED SAND FILTER AND REQUIRED SITE WORKS
TOOME , LETTERMACAWARD , DONEGAL PO
ENTRANCE SUN PORCH TO THE FRONT OF DWELLING AND PERMISSION FOR CONSTRUCTION OF EXTENSION TO THE SIDE OF DWELLING AND THE REPLACEMENT OF SUBSTANDARD SEPTIC TANK WITH A TREATMENT SYSTEM AND SAND FILTER
TOOME , LETTERMACAWARD , DONEGAL PO
REPLACEMENT OF AN EXISTING 10M HIGH WOODEN TELECOMMUNICATIONS STRUCTURE WITH AN 18M HIGH TELECOMMUNICATIONS MONOPOLE STRUCTURE TOGETHER WITH ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT, ENCLOSED BY SECURITY FENCING
TOOME , LETTERMACAWARD , LETTERKENNY PO
ERECTION OF A NEW DWELLING AND SUITABLE EFFLUENT TREATMENT SYSTEM
TOOME , LETTERMACAWARD , CO. DONEGAL
RENOVATION AND CONSTRUCTION OF EXTENSION TO DWELLING HOUSE, DECOMMISSIONING OF SEPTIC TANK AND INSTALLATION OF EFFLUENT TREATMENT SYSTEM, TERTIARY TREATMENT UNIT AND 37.5M2 INFILTRATION AREA INCLUDING ALL ASSOCIATED SITE WORKS
TOOME , LETTERMACAWARD , LETTERKENNY PO
(1) RELOCATION OF DWELLING HOUSE CONSTRUCTED TO A DIFFERENT DESIGN TO THAT PREVIOUSLY GRANTED PERMISSION UNDER PLANNING REFERENCE NO.16/50233 (2) PERMISSION FOR COMPLETION OF DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS
RANNY , LETTERMACAWARD , DONEGAL PO
RETENTION OF (1) CHANGE OF HOUSE TYPE AND RELOCATION OF HOUSE POSITION FROM THAT PREVIOUSLY GRANTED UNDER PLANNING PERMISSION REFERENCE NO.16/50233, (2) CHANGES TO ACCESS ARRANGEMENTS INTO SITE FROM L-6423-2 COUNTY ROAD, (3) CONNNECTION TO ON-SITE TREATMENT SYSTEM AND (4) COMPLETION OF DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS
RANNY , LETTERMACAWARD , DONEGAL PO
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?