2250259
N/ADonegal - Donegal County Council
Proposed Development
CONSTRUCTION OF A DWELLING HOUSE WITH INSTALLATION OF AN ON-SITE SEWAGE SYSTEM, TOGETHER WITH ALL ASSOCIATED WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
16 Feb 2022
Decision due
12 Apr 2022
Application Details
- Location
- ARDMALIN , MALIN HEAD , CO. DONEGAL
- Applicant
- N/A
- Application Type
- OUTLINE PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.409 ha
- Floor Area
- 1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 16 February 2022
- Status
- WITHDRAWN
- Decision
- N/A
- Decision Due
- 12 April 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ERECTION OF DWELLING WITH ONSITE SEWAGE TREATMENT PLANT, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ARDMALIN , MALIN , CO. DONEGAL
ERECTION OF A DWELLING WITH ONSITE SEWAGE TREATMENT PLANT, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ARDMALIN , MALIN , CO. DONEGAL
GLAMPING POD, ASSOCIATED DECKING AND CONNECTION TO EXISTING SERVICES
NO. 4 CAPTAIN'S COVE , MALIN HEAD , CO. DONEGAL
GLAMPING POD, ASSOCIATED DECKING AND CONNECTION TO EXISTING SERVICES
NO. 4 CAPTAIN'S COVE , MALIN HEAD , CO. DONEGAL
(1) DEMOLITION OF THE EXISTING DWELLING HOUSE DUE TO DEFECTIVE CONCRETE BLOCKWORK GRANTED UNDER PLANNING PERMISSION REF. NO. 96/717 AND (2) ERECTION OF A REPLACEMENT DWELLING TO BE CONNECTED TO THE EXISTING PREVIOUSLY APPROVED EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLYGORMAN , ARDMALIN , MALIN HEAD
(A) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE BLOCKS (PLANNING REF. NO. 97/1172 REFERS) AND (B) ERECTION OF A REPLACEMENT DWELLING WITH CHANGE OF HOUSE TYPE, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
SLIEVEBAWN , ARDMALIN MALIN HEAD , LIFFORD PO
DEMOLITION OF AN EXISTING TWO STOREY OVER BASEMENT REAR EXTENSION AND CONSTRUCTION OF A NEW TWO STOREY REAR EXTENSION TOGETHER WITH ALTERATIONS TO DWELLING HOUSE
SLIEVEBAWN , MALIN HEAD , LIFFORD PO
REPLACEMENT OF EXISTING SEPTIC TANK WITH A WASTEWATER TREATMENT PLANT AND SOIL POLISHING FILTER
ARDMALIN , MALIN HEAD , LIFFORD PO
DEMOLITION OF AN EXISTING TWO STOREY OVER BASEMENT REAR EXTENSION AND CONSTRUCTION OF A NEW TWO STOREY REAR EXTENSION TOGETHER WITH ALTERATIONS TO DWELLING HOUSE
ARDMALIN , MALIN HEAD , LIFFORD PO
(1) CONSTRUCTION OF A DOMESTIC OUTBUILDING (2) ERECTION OF A TEMPORARY DWELLING CABIN (3) CONNECTION TO EXISTING SERVICES APPROVED PERMISSION UNDER REF: 22/50547 TOGETHER WITH ALL ASSOCIATED WORKS
ARDMALIN , MALIN HEAD , LIFFORD PO
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?