The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2250582

N/A

Donegal - Donegal County Council

Proposed Development

ERECTION OF A DWELLING WITH ONSITE SEWAGE TREATMENT PLANT, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

View the full application file on the council's planning portal →

Application Details

Location
ARDMALIN , MALIN , CO. DONEGAL
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.22 ha
Floor Area
381.08 sq m
Residential Units
1

Timeline

Registration Date
5 April 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2250733N/A27 Apr 2022

ERECTION OF DWELLING WITH ONSITE SEWAGE TREATMENT PLANT, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

ARDMALIN , MALIN , CO. DONEGAL

116m
2250259N/A16 Feb 2022

CONSTRUCTION OF A DWELLING HOUSE WITH INSTALLATION OF AN ON-SITE SEWAGE SYSTEM, TOGETHER WITH ALL ASSOCIATED WORKS

ARDMALIN , MALIN HEAD , CO. DONEGAL

118m
2152030N/A13 Oct 2021

GLAMPING POD, ASSOCIATED DECKING AND CONNECTION TO EXISTING SERVICES

NO. 4 CAPTAIN'S COVE , MALIN HEAD , CO. DONEGAL

118m
2152333CONDITIONAL23 Nov 2021

GLAMPING POD, ASSOCIATED DECKING AND CONNECTION TO EXISTING SERVICES

NO. 4 CAPTAIN'S COVE , MALIN HEAD , CO. DONEGAL

224m
2561397CONDITIONAL14 Aug 2025

(A) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE BLOCKS (PLANNING REF. NO. 97/1172 REFERS) AND (B) ERECTION OF A REPLACEMENT DWELLING WITH CHANGE OF HOUSE TYPE, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS

SLIEVEBAWN , ARDMALIN MALIN HEAD , LIFFORD PO

274m
2251018CONDITIONAL13 Jun 2022

(1) CONSTRUCTION OF A DOMESTIC OUTBUILDING (2) ERECTION OF A TEMPORARY DWELLING CABIN (3) CONNECTION TO EXISTING SERVICES APPROVED PERMISSION UNDER REF: 22/50547 TOGETHER WITH ALL ASSOCIATED WORKS

ARDMALIN , MALIN HEAD , LIFFORD PO

275m
2250547CONDITIONAL30 Mar 2022

RENOVATION AND EXTENSION OF EXISTING DILAPIDATED DWELLING HOUSE, TOGETHER WITH AN ON-SITE SEWAGE SYSTEM AND ALL ASSOCIATED WORKS

ARDMALIN , MALIN HEAD , LIFFORD PO

275m
2151583N/A5 Aug 2021

RENOVATIONS & ERECTION OF AN EXTENSION TO EXISTING DILAPIDATED DWELLING HOUSE TOGETHER WITH AN ON-SITE SEWAGE SYSTEM AND ALL ASSOCIATED WORKS

ARDMALIN , MALIN HEAD , CO. DONEGAL

280m
2450085UNCONDITIONAL27 Feb 2024

DEMOLITION OF AN EXISTING TWO STOREY OVER BASEMENT REAR EXTENSION AND CONSTRUCTION OF A NEW TWO STOREY REAR EXTENSION TOGETHER WITH ALTERATIONS TO DWELLING HOUSE

SLIEVEBAWN , MALIN HEAD , LIFFORD PO

282m
1851827N/A3 Dec 2018

REPLACEMENT OF EXISTING SEPTIC TANK WITH A WASTEWATER TREATMENT PLANT AND SOIL POLISHING FILTER

ARDMALIN , MALIN HEAD , LIFFORD PO

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?