The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

22506

CONDITIONAL

Limerick - Limerick County Council

Proposed Development

the installation of roof-mounted heat pumps and photovoltaic panels, with ancillary site works. The site is located circa 155m from Plassey House (protected structure) and circa 542m from Plassey Mill and Headrace (protected structure). The University of Limerick campus falls within an architectural conservation area

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 May 2022

  2. Decision: CONDITIONAL

    17 Jun 2022

  3. Decision due

    30 Jun 2022

  4. Grant issued

    21 Jul 2022

Application Details

Location
International Business Centre , Block 2 University of Limerick , Dromroe Castletroy Co. Limerick
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council

Timeline

Registration Date
6 May 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 June 2022
Grant Date
21 July 2022
Permission Expires
20 July 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

151m
25154N/A15 May 2025

the conversion of the former garage to a habitable room, for the bedroom and shower room overhead and all associated site works

17 Careysford Avenue , College Court , Castletroy Co. Limerick.

152m
2583N/A20 Mar 2025

the first floor extension at the side of the house and other associated works

17 Careysford Avenue , College Court , Castletroy Co. Limerick.

154m
25227CONDITIONAL7 Jul 2025

the conversion of the former garage to a habitable room, for the bedroom and shower room overhead and all associated site works

17 Careysford Avenue , College Court , Castletroy Co. Limerick.

175m
2360361REFUSED29 May 2023

the construction of a first floor extension to the side of dwelling with additional car parking space and all associated site works

25 Carysford Avenue , College Court , Castletroy Limerick

178m
2360363REFUSED29 May 2023

the construction of a first floor extension to the side of dwelling with additional car parking space and all associated site works

27 Carysford Avenue , College Court , Castletroy Limerick

227m
211350CONDITIONAL28 Sept 2021

subdivision of Office Suite 1 on the Ground Floor of the existing building to form 2 no. independent Office Suites

Block 1 International Science Centre , University of Limerick , Castletroy Co. Limerick

236m
21428CONDITIONAL6 Apr 2021

change of use from light industrial to office use

Block 1 International Science Centre , University of Limerick , Castletroy Co. Limerick

267m
22760CONDITIONAL8 Jul 2022

of change of use of private domestic garage to bedroom and all associated site works

No. 23 College Court Drive , Castletroy , Limerick

273m
2360033CONDITIONAL30 Jan 2023

the construction of a new single storey extension and ancillary works to the rear of an existing dwelling house

1 Cambridge Close , College Court , Castletroy Limerick

297m
18396CONDITIONAL26 Apr 2018

the construction of an external lift to the south of the Foundation Building, University of Limerick, Sreelane, Castletroy, Co. Limerick. The development will consist of a three storey lift enclosure (16.5m2) between the upper plaza level and lower ground floor terrace level with a glazed link to the first floor level of the Foundation Building. The lift enclosure (13.2m high) will be clad in brickwork, concrete spandrel panels and copper roofing to match the existing building. The site is located circa 155m from Plassey House (protected structure) and circa 542m from Plassey Mill and Headrace (protected structure). The University of Limerick campus falls within architectural campus falls within an architectural conservation area

University of Limerick , Castletroy , Co. Limerick.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?