2250726
N/ADonegal - Donegal County Council
Proposed Development
ERECTION OF ONE LATTICE TYPE METEOROLOGICAL MAST NOT EXCEEDING 74 METRES IN HEIGHT, UNDERGROUND ELECTRICAL CABLES AND ASSOCIATED WORKS
View the full application file on the council's planning portal →Application Details
- Location
- CLOGHERAVADDY , DONEGAL PO , CO. DONEGAL
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.685 ha
Timeline
- Registration Date
- 25 April 2022
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ONE LATTICE TYPE METEOROLOGICAL MAST NOT EXCEEDING 74 METRES IN HEIGHT, UNDERGROUND ELECTRICAL CABLES AND ASSOCIATED WORKS TO BE IN PLACE FOR THE LIFE OF CLOGHERAVADDY WIND FARM
CLOGHERAVADDY , CO. DONEGAL
AMENDMENTS TO THE DEVELOPMENT PERMITTED UNDER AN BORD PLEANÁLA REF. 308419-20 (PLAN REF. NO. 20/51028 REFERS) FOR THE CONSTRUCTION OF A NEW ON-SITE 38 KV SUBSTATION AND ALL ASSOCIATED WORKS WITHIN THE CONSENTED RED LINE BOUNDARY
ALTCOR & MEENAGRANOGE , INVER , CO DONEGAL
AMENDMENTS TO THE DEVELOPMENT PERMITTED UNDER AN BORD PLEANÁLA REF. 308419-20 (PLAN REF. NO. 20/51028 REFERS) FOR THE CONSTRUCTION OF A NEW ON-SITE 38 KV AND 20KV SUBSTATION AND ALL ASSOCIATED WORKS WITHIN THE CONSENTED RED LINE BOUNDARY
ALTCOR & MEENAGRANOGE , INVER , CO DONEGAL
ERECTION OF 3 NO. WIND TURBINES WITH A HUB HEIGHT UP TO 69M AND A MAXIMUM BLADE TIP HEIGHT UP TO 110M, UNDERGROUND CABLING, BORROW PIT, TOGETHER WITH ASSOCIATED ACCESS ROADS, HARDSTANDS, CLEARFELLING OF TREES AND SITE WORKS. THE DEVELOPMENT PROPOSES A GRID CONNECTION VIA AN ELECTRICAL CONNECTION INTO THE NEARBY KILLEN HILL 38KV SUB STATION CONSISTING OF C.1,245M OF UNDERGROUND DUCTED CABLE IN THE TOWNLANDS ALTCOR AND MEENAGRANOGE AND AN EXTENSION TO KILLIN HILL 38KV SUB STATION IN MEENAGRANOGE. A NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION
ALTCOR AND MEENAGRANOGE , INVER , DONEGAL PO
ERECTION OF 3 NO. WIND TURBINES WITH A HUB HEIGHT UP TO 69M AND A MAXIMUM BLADE TIP HEIGHT UP TO 110M, UNDERGROUND CABLING, BORROW PIT, TOGETHER WITH ASSOCIATED ACCESS ROADS, HARDSTANDS, CLEARFELLING APPROXIMATELY 2.488HA OF TREES AND SITE WORKS. THE DEVELOPMENT ALSO PROPOSES A GRID CONNECTION VIA AN ELECTRICAL CONNECTION INTO THE NEARBY KILLIN HILL 38kV SUB-STATION CONSISTING OF C.1,245M OF UNDERGROUND DUCTED CABLE IN THE TOWNLANDS OF ALTCOR AND MEENAGRANOGE, AND A 332.2M2 EXTENSION TO KILLIN HILL 38kV SUB-STATION IN MEENAGRANOGE. AN APPROPRIATE PERIOD OF 5 YEARS (I.E. DURATION OF THE PLANNING PERMISSION TO CONSTRUCT THE DEVELOPMENT) IS SOUGHT, WITH AN OPERATIONAL LIFE OF 30 YEARS AFTER THE DATE OF COMMISSIONING. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT AND NATURA IMPACT STATEMENT WILL ACCOMPANY THIS APPLICATION
ALTCOR AND MEENAGRANOGE , INVER , DONEGAL PO
ERECTION OF A DWELLING, DOMESTIC GARAGE, AND WASTEWATER TREATMENT SYSTEM
KILLIN , FROSSES , DONEGAL P.O.
CONSTRUCTION OF A NEW DWELLING WITH SEPARATE DOMESTIC GARAGE AND WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
KILLIN , FROSSES , DONEGAL PO
2 NUMBER SHEEP AND CATTLE GRIDS WITH PEDESTRIAN ACCESS TO BE CONSTRUCTED OVER THE EXISTING ROADWAY THROUGH FARM AND ASSOCIATED SITE DEVELOPMENT WORKS
ALTCOR AND MEENAGRANOGE , INVER , DONEGAL PO
ERECTION OF SINGLE STOREY EXTENSIONS AND ALTERATIONS TO EXISTING DWELLING, CONNECTION TO EXISTING ON-SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
KILLIN , INVER , DONEGAL PO
ALTERATIONS TO AN EXISTING DWELLING HOUSE CONSISTING OF THE CONSTRUCTION OF AN EXTENSION TO THE SIDE AND REAR OF EXISTING DWELLING AND ELEVATIONAL CHANGES
KILLIN , INVER , DONEGAL PO
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?