The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2251123

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND A DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Jun 2022

  2. Further information requested

    18 Aug 2022

  3. Further information received

    23 Mar 2023

  4. Decision: CONDITIONAL

    14 Apr 2023

  5. Decision due

    19 Apr 2023

  6. Grant issued

    17 May 2023

Application Details

Location
CASHELEENAN , KILMACRENNAN , LETTERKENNY PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.39 ha
Floor Area
258 sq m
Residential Units
1

Timeline

Registration Date
29 June 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
14 April 2023
Grant Date
17 May 2023
Permission Expires
16 May 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

451m
2461249N/A14 Aug 2024

ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND ALL OTHER ASSOCIATED SITE WORKS

CASHELEENAN , KILMACRENNAN , LETTERKENNY PO

451m
2461269CONDITIONAL20 Aug 2024

ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

CASHELEENAN , KILMACRENNAN , LETTERKENNY PO

475m
2151004CONDITIONAL24 May 2021

ERECTION OF AN AGRICULTURAL MACHINERY STORAGE SHED WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

CASHELEENAN , KILMACRENNAN , LETTERKENNY

558m
2350245CONDITIONAL1 Mar 2023

ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA

CASHELEENAN , TERMON , LOUGH CAOL LETTERKENNY PO

733m
2660283CONDITIONAL25 Feb 2026

ERECTION OF A NEW DWELLING HOUSE AND DOMESTIC GARAGE WITH SEWAGE TREATMENT SYSTEM INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

GOLDRUM , TERMON , LETTERKENNY PO

754m
2660335CONDITIONAL4 Mar 2026

ERECTION OF A NEW DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

GOALDRUM , TERMON , LETTERKENNY

782m
2051776N/A23 Nov 2020

ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE

GOLDRUM , TERMON , LETTERKENNY PO

791m
2151036CONDITIONAL26 May 2021

ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE

GOLDRUM , TERMON , LETTERKENNY PO

805m
1950835N/A6 Jun 2019

(1) SITE LAYOUT CHANGES INCLUDING REDUCTION IN ROAD AND HARDSTANDING AREAS, REPOSITIONING OF THE ON-SITE WASTE WATER TREATMENT UNIT, REPOSITIONING OF GENERATOR HOUSING AND OMISSION OF EXTERNAL OIL TANK AND FENCE ENCLOSURE AND REVISED PARKING LAYOUT (2) REDUCTION IN THE FOOTPRINT OF THE WATER TREATMENT PLANT BUILDING AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING (3) REDUCTION IN THE FOOTPRINT OF THE SLUDGE BUILDING BY AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING (4) MODIFICATIONS TO THE RAW WATER BALANCING TANK STRUCTURE, INCLUDING REDUCING ITS HEIGHT (5) MODIFICATIONS TO THE CLEAR WATER TANK, INCLUDING REDUCING THE TANK HEIGHT AND RAISING THE LEVEL OF THE TANK WITH A RESULTANT MEAN INCREASE IN FINISHED GROUND LEVEL OF 1:48M (6) REPOSITIONING OF, AND ALTERATIONS TO, THE SLUDGE TREATMENT FACILITIES INCLUDING; INCREASING THE NUMBER OF TANKS FROM 6 TO 8, REPLACING THE SINGLE WASH WATER RECOVERY TANK WITH TWO CIRCULAR WASH WATER RECOVERY TANKS AND INSTALLATION OF AN ADDITIONAL UNDERGROUND STORAGE TANK (PROCESS WATER SUMP) (38.5 M2) (7) ALL ASSOCIATED SITE WORKS AND PERMISSION FOR MODIFICATIONS TO THE LANDSCAPING, GROUND LEVELS AND ASSOCIATED SITE WORKS TO ALLOW COMPLETION OF THE DEVELOPMENT.

GOLDRUM , TERMON , LETTERKENNY PO

822m
1951216CONDITIONAL8 Aug 2019

MODIFICATIONS TO THE WATER TREATMENT PLANT DEVELOPMENT PERMITTED UNDER PLANNING PERMISSION REFERENCE 15/51355 INVOLVING (1) SITE LAYOUT CHANGES INCLUDING REDUCTION IN ROAD AND HARDSTANDING AREAS, REPOSITIONING OF THE ON-SITE WASTEWATER TREATMENT UNIT, REPOSITIONING OF GENERATOR HOUSING AND EXTERNAL OIL TANK, OMISSION OF GENERATOR SHED ENCLOSURE AND REVISED PARKING LAYOUT; (2) REDUCTION IN THE FOOTPRINT OF THE WATER TREATMENT PLANT BUILDING AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING; (3) REDUCTION IN THE FOOTPRINT OF THE SLUDGE DEWATERING BUILDING AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING; (4) REDUCTION TO THE RAW WATER BALANCING TANK HEIGHT, INCLUDING OMISSION OF OUTLET CHAMBERS; (5) MODIFICATIONS TO THE CLEAR WATER TANK, INCLUDING REDUCING THE TANK DEPTH, REDUCTION IN FOOT PRINT, AND RAISING THE ROOF LEVEL OF THE TANK BY 1.48M (6) REPOSITIONING OF, AND ALTERATIONS TO, THE SLUDGE TREATMENT FACILITIES INCLUDING; INCREASING THE NUMBER OF TANKS FROM 6 TO 8, REPLACING THE SINGLE WASH WATER RECOVERY TANK WITH TWO CIRCULAR WASH WATER RECOVERY TANKS AND INSTALLATION OF AN ADDITIONAL UNDERGROUND STORAGE TANK (PROCESS WATER SUMP) (38.5 M2); (7) ALL SITE WORKS ASSOCIATED WITH CHANGES TO DEVELOPMENT

GOLDRUM , TERMON , LETTERKENNY