The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2251559

N/A

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS. RETENTION PERMISSION FOR WORKS RELATING TO EXTENDING THE EXISTING ENTRANCE ROAD FOR SITE INVESTIGATION WORKS

View the full application file on the council's planning portal →

Application Details

Location
MEENDERRYOWAN , ANNAGRY , CO DONEGAL
Applicant
N/A
Application Type
RETENTION
Planning Authority
Donegal County Council
Site Area
0.211 ha
Floor Area
184 sq m
Residential Units
1

Timeline

Registration Date
19 September 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
2251781CONDITIONAL28 Oct 2022

THE EXTENSION OF EXISTING ENTRANCE ROAD FOR SITE INVESTIGATION WORKS AND PERMISSION FOR CONSTRUCTION OF A NEW DWELLING HOUSE AND INSTALLATION OF A WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER WITH ALL SITE WORKS

MEENDERRYOWAN , ANNAGRY , LETTERKENNY PO

22m
2251640N/A3 Oct 2022

RETENTION PERMISSION FOR WORKS RELATING TO EXTENDING THE EXISTING ENTRANCE ROAD FOR SITE INVESTIGATION WORKS AND PERMISSION FOR CONSTRUCTION OF DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS.

MEENDERRYOWAN , ANNAGRY , CO DONEGAL

97m
1750762N/A17 May 2017

CONSTRUCTION OF A NEW SINGLE STOREY DWELLING HOUSE WITH DOMESTIC GARAGE AND PERMISSION TO INSTALL A NEW SEWAGE TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH RETENTION PERMISSION FOR PREVIOUSLY DEVELOPED ACCESS ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

MEENDERRYOWAN , ANNAGRY , LETTERKENNY PO

97m
1750894CONDITIONAL8 Jun 2017

CONSTRUCTION OF A NEW SINGLE STOREY DWELLING HOUSE WITH DOMESTIC GARAGE AND INSTALLATION OF A NEW SEWAGE TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH RETENTION OF PREVIOUSLY DEVELOPED ACCESS ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

MEENDERRYOWAN , ANNAGRY , LETTERKENNY PO

332m
2460209N/A26 Feb 2024

CEANNBHRAT AGUS LIMISTÉAR BRUSCAIR CLÚDAITHE A THÓGÁIL AG AN GCLÓS ATÁ AGAINN FAOI LÁTHAIR. BEIDH RÁITEAS TIONCHAIR NÁDÚRTHA (NIS) AG GABHÁIL LEIS AN IARRATAS SEO

MIN DOIRE GHABHANN , ANAGAIRE , CO. DONEGAL

417m
2051789CONDITIONAL25 Nov 2020

ERECTION OF AN EXTENSION TO EXISTING DWELLING, CONVERSION OF EXISTING DWELLING GARAGE TO LIVING ACCOMMODATION & CONSTRUCTION OF A NEW DOMESTIC SHED

MEENDERRYOWAN , ANNAGRY , LETTERKENNY PO

557m
1950702CONDITIONAL8 May 2019

ERECTION OF A NEW DWELLING HOUSE, A DOMESTIC GARAGE, INSTALLATION OF A NEW WASTE WATER TREATMENT UNIT AND A SAND POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

MEENDERRYOWAN , ANNAGRY , LETTERKENNY PO

559m
2660774N/A1 May 2026

(1) EXCAVATION OF THE EXISTING ROCK EMBANKMENT ADJACENT TO THE FACTORY BUILDING TO A HEIGHT EXCEEDING 1.0M, (2) TEMPORARY STORAGE OF MOUNDS OF ROCK ON THE SITE, (3) FILLING OF LANDS ALONG THE WESTERN BOUNDARY OF THE SITE BY THE PROVISION OF THE SAME EXCAVATED ROCK FROM THE SITE TO A HEIGHT EXCEEDING 1.0M, (4) STORAGE SHED WITH THREE CLOSED SIDES AND ONE OPEN SIDE, (5) EXTENSION TO THE MAIN FACTORY BUILDING FOR THE PURPOSES OF STORAGE OF MATERIALS, (6) SMALL EXTENSION TO THE FACTORY TO FACILITATE THE FACTORY PRODUCTION PROCESS, (7) CONTAINERS ON THE SITE FOR THE PURPOSES OF EXTERNAL STORAGE, (8) CLEARANCE OF LANDS TO THE FRONT OF THE SITE AS-CONSTRUCTED AND (9) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS. AN AA SCREENING REPORT ACCOMPANIES THIS APPLICATION

MEENDERRYOWAN , ANNAGRY , LETTERKENNY PO

601m
1751911N/A18 Dec 2017

CONSTRUCTION OF A NEW DRY AGRICULTURAL SHED 18X9M FOR STORAGE OF MACHINERY

MEENDERRYOWAN , ANNAGRY , LETTERKENNY P.O.

602m
1850035CONDITIONAL12 Jan 2018

CONSTRUCTION OF A NEW DRY AGRICULTURAL SHED 18m X 9M FOR STORAGE OF MACHINERY

MEENDERRYOWAN , ANNAGRY , LETTERKENNY P.O.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?