2252057
N/ADonegal - Donegal County Council
Proposed Development
(1) ERECTION OF (A) UP TO 32 CONTAINERS TO HOUSE LITHIUM-ION BATTERIES OR SIMILAR TECHNOLOGY CIRCA 14.0M LENGTH, 2.44 WIDE AND 2.9 HIGH FOR ELECTRICITY STORAGE (B) A HARDSTAND COMPOUND AREA SURROUNDED BY A 2.6M HIGH PALISADE FENCE (C) BATTERY ENERGY STORAGE SYSTEM (BESS) CONTROL BUILDING (D) SYNCHRONOUS CONDENSER COMPOUND COMPRISING OF A HORIZONTAL SYNCHRONOUS GENERATOR POSITIONED WITHIN A BUILDING, CONTROL BUILDING AND AIR COOLING (E) INTERNAL CABLE TO CONNECT THE FACILITY TO THE EXISTING CLOGHER 110KV SUBSTATION (2) GRID CONNECTION WILL BE VIA THE EXISTING 110KV CLOGHER SUBSTATION (3) OTHER ANCILLARY INFRASTRUCTURE AT THE COMPOUND CONSISTING OF CCTV POLES, PARKING FACILITIES AND LIGHTING. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
View the full application file on the council's planning portal →Application Timeline
Application received
16 Dec 2022
Application withdrawn
20 Jan 2023
Application Details
- Location
- CULLIONBOY , BARNESMORE , DONEGAL PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 3.42 ha
Timeline
- Registration Date
- 16 December 2022
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 20 January 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ALTERATIONS TO EXISTING DWELLING HOUSE TO INCLUDE CHANGES TO WINDOWS ON THE SIDE AND REAR ELEVATIONS, A NEW GABLED DORMER WINDOW ON THE FRONT ELEVATION AND A CAR PORT TO THE REAR WITH ALL ASSOCIATED SITE WORKS
CULLIONBOY , BARNESMORE , DONEGAL PO
CONSTRUCTION OF A SINGLE-STORY EXTENSION & DOMESTIC GARAGE TO THE SIDE OF THE EXISTING DWELLING AND ALL ANCILLARY SITE WORKS NECESSARY
KEADEW LOWER , BARNESMORE , DONEGAL PO
ERECTION OF A SINGLE STOREY EXTENSION & DOMESTIC GARAGE TO THE SIDE OF THE EXISTING DWELLING AND ALL ANCILLARY SITE WORKS NECESSARY
KEADEW UPPER , BARNESMORE , DONEGAL PO
CONSTRUCTION OF A SINGLE-STORY EXTENSION & DOMESTIC GARAGE TO THE SIDE OF THE EXISTING DWELLING AND ALL ANCILLARY SITE WORKS NECESSARY
KEADEW LOWER , BARNESMORE , DONEGAL PO
CONSTRUCTION OF A DWELLING WITH INTEGRAL GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
KEADEW UPPER , BARNESMORE , DONEGAL PO
TWO STOREY EXTENSION TO THE REAR OF EXISTING TWO STOREY HOUSE AND ALL ASSOCIATED SITE WORKS
CULLIONBUOY , BARNESMORE , DONEGAL PO
CONSTRUCTION OF A DWELLING HOUSE WITH INTEGRAL GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
KEADEW UPPER , BARNESMORE , DONEGAL PO
CHANGE OF USE OF THE EXISTING BARNESMORE COMMUNITY CENTRE TO A MONTESSORI SCHOOL AND COMMUNITY CENTRE
KEADEW UPPER , BARNESMORE , DONEGAL PO
CHANGE OF USE OF THE EXISTING BARNESMORE COMMUNITY CENTER TO A MONTESSORI SCHOOL AND COMMUNITY CENTRE
KEADEW UPPER , BARNESMORE , DONEGAL PO
CONSTRUCTION OF A SINGLE STOREY STEEL FRAMED WORKSHOP SHED, DEVELOPMENT OF STONED TURNING / PARKING AREA, WIDENING OF THE EXISTING ACCESS LANE AND ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
DRUMINNIN , DONEGAL PO , CO. DONEGAL
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?