Proposed Development

for the construction of a hybrid treatment system composed of constructed wetlands and assimilation in tree plantation for domestic effluent and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Jun 2022

  2. Application withdrawn

    23 Aug 2022

  3. Decision due

    24 Aug 2022

Application Details

Location
Islandmagrath , Clarecastle , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council

Timeline

Registration Date
30 June 2022
Status
WITHDRAWN
Decision
N/A
Decision Due
24 August 2022
Withdrawn
23 August 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

418m
23169CONDITIONAL16 Mar 2023

the development will consist of a dwelling house with proprietary wastewater treatment system & polishing filter together with ancillary site works

Islandmagrath , Clarecastle , Co Clare

539m
21630CONDITIONAL17 Jun 2021

to construct an agricultural storage barn including all ancillary site works and services

Island McGrath , Clarecastle , Co Clare

624m
22888CONDITIONAL3 Oct 2022

to construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works

Islandmacgrath , Clarecastle , Co Clare

1.2km
21929CONDITIONAL2 Sept 2021

for 'change of use' from childcare facility to private dwelling house including any alterations as required together with all associated site works and services

Lissane West , Clarecastle , Co Clare

1.2km
171001CONDITIONAL22 Dec 2017

for a ten year Permission to develop a solar farm on a site located in the townlands of Lissan West and Ballaghafaddy West, Clarecastle. Co. Clare. The proposed solar farm will comprise the construction and operation of solar PV arrays mounted on metal frames on a 33.i Ha site, inclusive of a single electrical control building, onsite substation, up to 8 No. inverter units, up to 1 No. temporary construction areas with ancillary facilities, boundary fencing with CCTV units, use of existing access, an access track and all associated works ( inclusive of gross floor space of proposed works up to 207.6 sqm ). The planning application is accompanied by an environmental report and Stage 1 Screening for Appropriate Assessment

Lissan West , Ballaghafaddy West , Clarecastle

1.2km
203N/A8 Jan 2020

to construct workshop extension building to existing Vehicle Test Centre along with all associated site works and services.

Ballaghafadda West Td , Clarecastle

1.8km
17581CONDITIONAL27 Jul 2017

to (a) alter, renovate and extend existing semi-detached cottage; (b) construct new domestic garage; (c) upgrade wastewater treatment arrangement together with all ancillary site development works and services

Lisanne East , Clarecastle , Co. Clare

1.8km
24111CONDITIONAL5 Apr 2024

of a garden fuel storage shed, an extension of an existing garden shed and a garden hut temporary structure in the rear garden of the house

Lissane East , Clarecastle , Co. Clare

1.8km
211203CONDITIONAL15 Nov 2021

for (a) demolition of existing sun room (b) renovation and extension of existing private dwelling house and all associated site works

Claremont , Clarecastle , Co Clare

1.9km
22194CONDITIONAL4 Mar 2022

to construct a dwelling house, detached garage, vehicular entrance, driveway, wastewater treatment system, connection to services and ancillary site works

Ballaghafadda West , Clarecastle , Co Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?