22584
N/AKerry - Kerry County Council
Proposed Development
(A) CONSTRUCT A SINGLE STOREY SUN ROOM AND EXTENSION TO THE EXISTING TOILET TO THE REAR/EASTERN SIDE OF EXISTING DWELLING HOUSE IN LIEU OF EXISTING SUN ROOM TO BE DEMOLISHED; (B) PLANNING PERMISSION TO CONSTRUCT A SINGLE STOREY EXTENSION ONTO THE SOUTHERN GABLE OF EXISTING DWELLING HOUSE IN LIEU OF EXISTING EXTENSION TO BE DEMOLISHED; AND FOR ALL ASSOCIATED ANCILLARY SITE WORKS
View the full application file on the council's planning portal →Application Details
- Location
- KILVICKADOWNIG , VENTRY , CO KERRY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kerry County Council
- Site Area
- 0.161 ha
Timeline
- Registration Date
- 7 June 2022
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(A) CONSTRUCT A SINGLE STOREY SUN ROOM AND EXTENSION TO THE EXISTING TOILET TO THE REAR/EASTERN SIDE OF EXISTING DWELLING HOUSE IN LIEU OF EXISTING SUN ROOM TO BE DEMOLISHED (B) PLANNING PERMISSION TO CONSTRUCT A SINGLE STOREY EXTENSION ONTO THE SOUTHERN GABLE OF EXISTING DWELLING HOUSE IN LIEU OF EXISTING EXTENSION TO BE DEMOLISHED, AND FOR ALL ASSOCIATED ANCILLARY SITE WORKS
KILVICKDOWNIG , VENTRY , CO. KERRY
CEAD COINNEALA PLEANALA CHUN AN BOTHAN ADHMAD AGUS NA HAITEANNA SEASTAN CRUA A COIMEAD AR AN LATHAIR (RETENTION PERMISSION TO RETAIN THE TIMBER SHED AND HARD STANDING AREAS)
CILL MHIC AN DOMHNAIGH , CEANN TRA , CO CHIARRAI
CONSTRUCT AN EXTENSION TO THE REAR OF HOUSE AND CARRY OUT ALL NECESSARY SITE WORKS
KILVICKADOWNIG , VENTRY , CO KERRY
TIGH CONAITHE A THOGAIL LE AONAD COIREALA FUIOLLUISCE AGUS SCAGAIRE SNASTA A THOGAINT ( CONSTRUCT A DWELLING HOUSE WITH WASTEWATER TREATMENT UNIT AND POLISHING FILTER )
KILVICKADOWNIG , CEANN TRA , CO CHIARRAI
TIGH CÓNAITHE AGUS GARÁISTE A THÓGAIL LE DABHACH MHÚNLAIGH AGUS LIMISTÉAR SÍOTHLAITHE BUILD A DWELLING HOUSE AND SHED WITH SEPTIC TANK AND PERCOLATION AREA
FÁN , CEANN TRÁ
(A) TO RETAIN THE EXISTING DWELLING HOUSE AND OUTBUILDING ON SITE WITHIN REVISED SITE BOUNDARIES, (B)TO RETAIN THE REVONATION AND EXTENSION OF THE OUTBUILDING ON SITE FOR USE AS SLEEPING ACCOMMODATION ONLY, ANCILLARY TO THE MAIN DWELLING HOUSE ON SITE. THIS OUTBUILDING IS NOT AN INDEPENDENT LIVING UNIT AND PLANNING PERMISSION TO CONSTRUCT A SINGLE STOREY EXTENSION TO THE SIDE OF THE EXISTING DWELLING HOUSE TO BE USED AS A HOME OFFICE AND CARRY OUT ALL NECESSARY ASSOCIATED SITE WORKS
CAHERBULLIG , VENTRY , DINGLE
retain an existing dwelling house and existing detached garage/storage shed as constructed within revised site boundaries and planning permissin to decommission and remove an existing septic tank and soak pit on site and in its place install a new wastewater treatment unit discharging to a sand polishing filter and also to include all associated site works
Caherbullig , Ventry , Co Kerry
(A) DEMOLISH AN EXISTING STORAGE SHED, (B) CONSTRUCT A SINGLE STOREY EXENSION TO THE REAR OF AN EXISTING DWELLING HOUSE, (C) CONSTRUCT A DETACHED STORAGE SHED/STUDY AREA SERVING THE EXISTING DWELLING (D) DECOMMISSION OF AN EXISTING SEPTIC TANK ON SITE AND INSTALL A NEW WASTEWATER TREATMENT UNIT, DISCHARGING TO A SAND POLISHING FILTER AND ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS
RAHEEN , VENTRY , TRALEE
PLANNING PERMISSION TO (A) RENOVATE THE EXISTING DWELLING HOUSE; (B) DEMOLISH THE EXISTING SINGLE-STOREY SIDE EXTENSION AND CONSTRUCT A REPLACEMENT SINGLE-STOREY SIDE EXTENSION; (C) CARRY OUT ALL ASSOCIATED SITE WORKS
Caheratrant , Ventry , Co Kerry
(a) retain existing dwelling house and associated site works within revised site boundaries (b) retain conservatory extension to side of dwelling and Full Planning Permission to (a) renovate the existing dwelling house (b) demolish the existing single-storey side conservatory extension and construct a replacement single-storey side extension (c) carry out all associated site works
Caheratrant , Ventry , County Kerry
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?