2260018
N/ALimerick - Limerick County Council
Proposed Development
Change of house design & change of site boundaries from those permitted in planning file 19-577 at Canal Bank, Rheboge, Co. Limerick
View the full application file on the council's planning portal →Application Details
- Location
- CANAL BANK , RHEBOGE , CO. LIMERICK
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
- Site Area
- 0.05 ha
Timeline
- Registration Date
- 23 December 2022
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the change of house design & change of site boundaries from those permitted in planning file 19-577
Canal Bank , Rheboge , Co. Limerick
the provision of a small detached dwelling house, connections to the local sewer and public water supply as well as boundary treatment and all associated site works on and under land
Canal Bank , Rhebogue , Limerick.
opening up the front wall and forming a vehicular entrance to his yard
Canal Bank , Limerick
a new dwelling, mains sewer and water connection, boundary wall improvements, entrance and associated works
Canal Bank , Rhebogue , Co. Limerick.
a new bridge crossing of the canal will be constructed to the east of the current Park Road Bridge. This new bridge will connect Lower Park Road with Park Road, facilitating two-way traffic flow. Vehicle traffic on South Canal Road will change from the current one-way system to a two-way system with the carriageway being widened accordingly. The existing Park Road Bridge will be retained as a pedestrian and cycle facility and the existing traffic lights at this location will be removed. In addition to the above, the works will also include an upgrade of the junction underneath the northern span of the adjacent rail bridge to the east of Park Road Bridge which currently has poor sightlines and widths for road users. The proposed works also include for new road surfacing and the installation of LED public lighting as well as surface water drainage. Accommodation works will be undertaken as required
Park Road and Lower Park Road , Limerick.
building of a new canal bridge to provide two-way traffic flow between Canal Bank, Park Road and Lower Park Road, Limerick. The proposed development will consist of a new bridge crossing of the canal to be constructed to the east of the current Park Road Bridge. This new bridge will connect Lower Park Road with Canal Bank, Park Road, facilitating two-way traffic flow. Vehicle traffic on South Canal Road will change from the current one-way system to a two-way system with the carriageway being widened accordingly. The existing Park Road Bridge will be retained as a pedestrian and cycle facility only with the existing traffic lights at this location being removed. The proposed works also include for new road surfacing, installation of LED public lighting & surface water drainage, and demolition of an existing out building on the corner of Park Road and Canal Bank with accommodation works as required
Canal Bank Park Road and Lower Park Road , Limerick
a garage/tool shed as built and for it's continued use as living accommodation for the duration of the reconstruction and renovation of the existing derelict cottage on site, retention permission and completion of a fuel store also permission for the complete renovation and extension of the said derelict cottage including the construction of a new domestic shed for the storage of equipment in connection with the applicant's construction business
Tromard , Lower Park Road , Corbally Limerick
the completion of a domestic garage/tool shed and a site boundary wall
Tromard , Lower Park Road , Corbally Limerick
the demolition of a single-storey extension and the construction of a single-storey extension to the west(rear) of the dwelling and ancillary site works
No. 3 Lower Park , Corbally , Limerick
attic conversion to store room
31 Abbeylock , Corbally , Limerick
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?