2260070
CONDITIONALTipperary - Tipperary County Council
Proposed Development
the following; 1) rear and side extension to my dwelling and 2) 3no. storage sheds and all associated site development works
View the full application file on the council's planning portal →Application Timeline
Application received
17 Feb 2022
Decision: CONDITIONAL
6 Apr 2022
Decision due
13 Apr 2022
Grant issued
10 May 2022
Application Details
- Location
- Killurney , Ballypatrick , Clonmel
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.19 ha
Timeline
- Registration Date
- 17 February 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 6 April 2022
- Grant Date
- 10 May 2022
- Permission Expires
- 9 May 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of 1) a new storey & half dwelling 2) new domestic garage 3) new site entrance, driveway and modification to hedgerow 4) waste water treatment system and all associated site works
Killurney , Kilsheelan , Clonmel
construction of 1) a new storey and half dwelling 2) new domestic garage 3, new site entrance, driveway and modification to hedgerow 4) waste water treatment system and all associated site works
Killurney , Kilsheelan , Clonmel
the construction of new single storey dwelling, proposed waste-water treatment system and percolation area, external garage, new site entrance including gate and piers and modifications to hedgerow and All necessary associated site works and services
Cooloran , Ballypatrick , Clonmel Co. Tipperary
demolition of existing non original extensions to rear of farmhouse and construction of new single storey extension to rear and upgrade of associated waste water treatment system alongside conversion and change of use of existing single storey barn into a one bed dwelling including new well, new waste water treatment system and all associated landscaping and site works.
Killurney , Clonmel , Co. Tippeary
a 10 year permission. The development will consist of a solar farm with an export capacity of 12 MW compositing of photovoltaic panels on ground mounted frames with associated infrastructure including 4 No. Inverter Housing cabins, 1 No. control building, 1 No. customer cabin (substation), 1 No. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks. The planning application will be accompanied by a Natura Impact Statement
Ballyboe , Clonmel , Co. Tipperary
amend the design of the approved development (Planning Ref: 19/600239) which comprises consent for the development of a temporary (30 years) solar farm with an export capacity of 12 MW comprising of photovoltaic panels on ground mounted frames with associated infrastructure including 4 no. inverter housing cabins, 1 no. control building, 1 no. customer cabin (substation), 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks subject to 16 conditions. Amendments proposed are: - - Although the height of the solar panels is increased from 2.7m to a maximum 3.2m, the glint and glare impacts will reduce due to advancements in the assessment and software used. The panel tilt angle will change from between 15 and 25 degrees to 15 and 30 degrees; - The number of solar modules will reduce from 39,168 to 30,060 and the number of pile driven poles installed will increase from 2,548 to 4,258; - Although there will be an increase in the number of Inverter Substations from 4 to 6, these have a lower noise output and will therefore result in lower noise impacts; - An increase in CCTV cameras along the perimeter fence from 8 to 12; - Although the road will remain at a width of 3.5m, the point where it connects from the southern to northern lands is moved to use the existing access; - An almost identical footprint which will increase by 0.03% to 4.08%; and – Increase the output from 12MW to 16MW
Ballyboe , Clonmel , Co. Tipperary
a RED III development for a period of 10 years for the construction of a solar PV energy development (renewable energy development) with a total site area of 32.6 hectares. The development will consist of PV panels mounted on metal frames, inverter station, string inverters, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, new on-site ESB 38kV substation building, 33kV control building, lighting masts, laydown areas, landscaping and all ancillary grid infrastructure and associated works. The grid route is c. 1.06km in length. The Application Site will be accessed from two new access points off the R706, one of which was previously consented under Planning Reference: 19600239. The Proposed Development will connect with and represents an extension to the adjacent solar farm permitted under Planning Reference 19600239 and 21403. Permission is also sought for minor amendments to Planning Reference 19600239 and 21403 which comprises of (1) Minor adjustments to the perimeter fencing (length decreasing by c.1km), (2) Minor adjustments to the red line boundary (decreasing by c.1km), (3) Increase operational lifetime from 30 years to 40 years. The proposed solar farm will connect to the national grid via the new 38kV substation and will have an operational lifetime of 40 years. A Natura Impact Statement (NIS) has been prepared in respect of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Within the townland of , Ballyboe , County Tipperary
The development will consist of; demolition of existing non original extensions to rear of farmhouse and construction of a new single storey extension to rear and upgrade of associated waste water treatment system alongside conversion and change of use of existing single storey barn into a one bed dwelling including new well, new waste water treatment system and all associated landscaping and site works.
Killurney , Clonmel , Co Tipperary
construction of a single storey domestic dwelling house, entrance, driveway and tertiary wastewater treatment system along with necessary ancillary site works. Permission also required of Local Authority to place a mobile home on site for duration of the build
Killurney , Ballypatrick , Clonmel
demolition of existing single storey extension and construct part 2 storey part single storey extension, raise roof of existing dwelling, upgrade wastewater system to current EPA standards, construct wing walls and piers to existing entrance and all other associated site works
Cooloran , Ballypatrick , Clonmel
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?