2260121

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility, increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility, air handling bio-filter installation and associated extract and input fans, all necessary site works, an Environmental Impact Assessment (EIAR) will be submitted with the application to Tipperary Co. Co. with the planning application and the proposed development will require a review of the site’s EPA Industrial Emissions Licence (W0270-02)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Mar 2022

  2. Further information requested

    5 May 2022

  3. Further information received

    4 Jul 2022

  4. Decision due

    20 Sept 2022

  5. Decision: CONDITIONAL

    20 Sept 2022

  6. Appeal submitted

    12 Oct 2022

  7. Grant issued

    5 Dec 2023

  8. Appeal decided: MODIFIED

    5 Dec 2023

Application Details

Location
Milltownmore , Fethard , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
3.93 ha

Timeline

Registration Date
14 March 2022
Status
APPEALED FINANCIAL
Decision
CONDITIONAL
Decision Date
20 September 2022
Grant Date
5 December 2023
Permission Expires
4 December 2028

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-314834-22
Decision
MODIFIED
Submitted
12 October 2022
Decided
5 December 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
21808REFUSED3 Jun 2021

reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility. Increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility. Air handling bio-filter installation and associated extract and input fans. All necessary site works. An Environmental Impact Assessment (EIAR) will be submitted with the application to Tipperary Co. Co. with the planning application and the development will require a review of the site’s EPA Industrial Emissions License (W0270-02)

Milltownmore , Fethard , Co. Tipperary

3m
17600372CONDITIONAL11 Apr 2017

an increased throughput of organic waste material at the existing Miltown Composting Ltd. facility. The proposed planning consists of an increased throughput which will also require a review of the facility's EPA Waste Licence (Reg. No. W0270-01). The application shall be accompanied by an Environmental Impact Statement

Miltownmore , Fethard , Co. Tipperary

16m
19600690CONDITIONAL21 Jun 2019

reconstruction of and extension to existing agricultural storage building and all necessary site works and services

Milltownmore , Fethard , Co. Tipperary

20m
18600472CONDITIONAL18 Apr 2018

Biofilter and associated extract and input fans to compost maturation shed with embankment screen. Roof watering harvesting storage tank.

Milltownmore , Fethard , Co. Tipperary

52m
17600297N/A23 Mar 2017

an increased throughput of organic waste material at the existing Miltown composting facility. The proposed planning consists of an increased throughput which will also require a review of the facility's EPA Waste Licence (Reg. No. W0270-01). The application shall be accompanied by an Environmental Impact Statement

Miltownmore , Fethard , Co. Tipperary

54m
19600561N/A24 May 2019

reconstruction of and extension to existing agricultural storage building and all necessary site works and services

Milltowmore , Fethard , Co Tipperary

85m
22655CONDITIONAL2 Dec 2022

to construct a 36-meter- high multi use lattice tower telecommunications structure with headframe carrying antenna and dishes enclosed with a 2.4 meter high palisade fence compound with associated ground equipment and associated site works including new access track

Moorstown , Fethard , Co Tipperary

86m
22635N/A15 Nov 2022

a 36 metre high multi-user lattice tower telecommunications structure with headframe carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound with associated ground equipment and associated site works including new access track

Milltownmore , Fethard , Co Tipperary

884m
22337N/A5 May 2022

(A) alterations to elevations of the existing dwelling house and changes to the roof height at the rear of the dwelling from planning permission granted under P314075. (B) Retention permission to retain the construction of an extension to the rear of the dwelling. (C) Retention permission for the change of use of domestic garage to granny flat

Moorstown , Fethard , Co Tipperary

886m
22281N/A7 Apr 2022

A) alterations to elevations of existing dwelling house & changes to roof height at the rear of the dwelling from planning permission granted under P3/14075. B) an extension to the rear of the dwelling & continuance of use as a granny flat, C) for the change of use of domestic garage to granny flat and continuance of use as a granny flat

Moorstown , Fethard

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?