2260366
N/ATipperary - Tipperary County Council
Proposed Development
an extension to an existing Loose Cattle Shed and associated works. The number of buildings is 1 and the apex height will be 5.504. The proposed height at the eave on the east side will be 3.1 mt.
View the full application file on the council's planning portal →Application Details
- Location
- Thomastown , Grange , Clonmel
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.17 ha
Timeline
- Registration Date
- 13 July 2022
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
an extension to an existing Loose Cattle Shed and associated works
Thomastown , Grange , Clonmel
construction of new entrance and close existing entrance and all associated site works
Park , Grange , Co. Tipperary
the construction of a dwelling house, treatment system, driveway, entrance and all associated site development works
Grange , Clonmel , Co. Tipperary
fill the depression in the ground and reinstate ground to new levels including temporary access and all associated site development works
Crutta North , Grange Clonmel , Co. Tipperary
to fill the depression in the ground and reinstate ground to new levels including all associated site development works
Crutta North , Grange Clonmel , Co. Tipperary
the construction a dwelling house, treatment system, driveway, entrance and all associated site development works
Grange , Clonmel , Co. Tipperary
the construction of a classroom on the site of an existing pre-fab and associated site development works
Grange National School , Park Grange , Clonmel
retain indefinitely an existing pre-fab
Grange National School , Park , Clonmel
retain indefinitely an existing pre-fab
Grange National School , Park , Clonmel
retain indefinitely an existing Pre-Fab
Grange National School , Park , Clonmel
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?