The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

22633

CONDITIONAL

Clare - Clare County Council

Proposed Development

of the following works a) boundary walls and site entrances as constructed b) windows, fascia, soffit and rainwater pipes c) internal layout between No. 5 & No. 6 along with associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Jul 2022

  2. Decision: CONDITIONAL

    2 Sept 2022

  3. Decision due

    6 Sept 2022

  4. Grant issued

    7 Oct 2022

Application Details

Location
Dough , Spanish Point , Co Clare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Clare County Council

Timeline

Registration Date
13 July 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 September 2022
Grant Date
7 October 2022
Permission Expires
6 October 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
18220CONDITIONAL22 Mar 2018

to construct a building for the purposes of using it as an Art Studio and to connect to existing site services along with associated site works

Dough , Spanish Point , Co. Clare

208m
18287CONDITIONAL12 Apr 2018

to convert and extend existing service/utility building to storage building and office incorporating the following works: Ground floor extensions and eleavational changes, raised roof/ridge level to accommodate first floor storage plus all ancillary site works.

Bellbridge Hoilday Park , Dough , Spanish Point

319m
2560089CONDITIONAL26 Feb 2025

for the construction of an extension to existing dwelling to comprise of utility & toilet (to replace existing), kitchen, playroom, wet room, relaxation room and garage with internal modifications to dwelling including ancillary site works

3 Atlantic View , Spanish Point , Miltown Malbay Co. Clare V95 CX62

344m
19995REFUSED19 Dec 2019

to construct a dwelling house and garage, including a wastewater treatment system, new road access and ancillary works

Annagh , Miltown Malbay , Co Clare

366m
22953CONDITIONAL20 Oct 2022

to construct a new dwelling house, sewage treatment system and construct a new entrance onto public road and associated site works

Annagh , Miltown Malbay , Co. Clare

372m
20985CONDITIONAL18 Dec 2020

to construct an extension to rear of existing clubhouse

Dough , Spanish Point , Co Clare

373m
21610CONDITIONAL11 Jun 2021

to construct the following (a) A golf training room with compressor room and store room at basement level (b) A covered area between the existing clubhouse and the proposed training room (c) A small extension off the lounge to front of building (d) A refuse area with low walls on either side parallel to clubhouse (e) Enlarge window to front of building

Dough , Spanish Point , Co Clare

449m
19624CONDITIONAL1 Aug 2019

for development of 2 No. velux roof windows to front and rear of existing dwelling and to complete conservatory to side of same granted under P07-648 and a private garage

Annagh , Miltown Malbay , Co. Clare

462m
2460236CONDITIONAL23 May 2024

for the refurbishment and extension of an existing house and associates site works.

Dough Tld. , Miltown Malbay , Co. Clare

495m
2660146N/A10 Mar 2026

for development of 1 no. primary wastewater pumping station at the Armada House and 1 no. secondary wastewater pumping station at the Armada Hotel, Spanish Point County Clare and for the development of a rising main wastewater pipe (c. 4.3kms in length) located within the public road carriageway (L6224, R482 and N67) in the townlands of Leagard South, Dough, Annagh, Caherrush, Emlagh and Quilty West, County Clare. The proposed development includes works within the curtilage of a protected structure, Armada House, formally Mother McCauley House (RPS No. 025) and works to the Bealaclugga Bridge which is a protected structure (RPS No. 185). The proposed development will consist of the following: 1. Provision of 1 no. primary wastewater pumping station at the Armada House, to service the existing Armada Hotel and the existing Armada House; 2. Provision of 1 no. secondary wastewater pumping station at the Armada Hotel, including 2 no. wastewater holding tanks; 3. Provision of a 110mm rising main pipe from the Armada Hotel to the Armada House (c. 240m in length), within the public road crossing the R482 and L6224; 4. Provision of 1 no. 110mm rising main pipe located within the public road (L6224, R482 and N67) from the proposed primary wastewater pumping station at the Armada House to the existing Irish Water foul sewer network at Quilty, which conveys flows to the existing Irish Water Kilmurry Ibrickane Wastewater Treatment Plant (Asset Number: D0536-02). The proposed rising main is c.4.3km in length and located entirely within the public road corridor; 5. Decommissioning and removal of 1 no. existing wastewater treatment plant, existing polishing filter, and existing percolation area at the Armada Hotel; 6. Decommissioning and removal of 1 no. existing wastewater treatment system and percolation area at the Armada House; 7. Provision of 1 no. temporary construction compound at the Armada House for the duration of the works; 8. All associated development and site enabling works and ancillary infrastructure including screening planting, scour valves, air valves,1 no. vent pipe, and 1 no. discharge manhole. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development

Armada House and Hotel , Spanish Point , Co. Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?