The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

22699

CONDITIONAL

Clare - Clare County Council

Proposed Development

of A) Revised boundaries to existing graveyard extension granted under Planning Ref: P12-437 and B) PERMISSION to construct Columbarium Wall plus all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Aug 2022

  2. Decision: CONDITIONAL

    21 Sept 2022

  3. Decision due

    28 Sept 2022

  4. Grant issued

    27 Oct 2022

Application Details

Location
Lisheenrony , Carrigaholt , Co Clare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Clare County Council

Timeline

Registration Date
4 August 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
21 September 2022
Grant Date
27 October 2022
Permission Expires
26 October 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

398m
18144CONDITIONAL26 Feb 2018

to reduce and alter design of extension as previously granted under P16-731, together with ancillary site works

Lisheencrony , Carrigaholt , Co. Clare

398m
17738CONDITIONAL28 Sept 2017

to construct a detached garage together with all ancillary site development works and services

Lisheencrony , Carrigaholt , Co. Clare

642m
211038CONDITIONAL29 Sept 2021

for the following development; (a) construct a replacement dwelling house to replace the existing sub-standard derelict cottage; (b) new site entrance; (c) private garage; (d) upgrade existing on-site wastewater treatment system; (e) convert existing derelict cottage to storage shed ancillary to proposed new dwelling; and (f) all associated site works and services

Lisheencrony , Kilkee , Co Clare

671m
1888CONDITIONAL8 Feb 2018

to construct agricultural slatted unit, plus all ancillary site works

Lisheencrony , Kilkee , Co. Clare

802m
22794CONDITIONAL6 Sept 2022

of a storage building to store a boat over the winter months

Lisheencrony , Carrigaholt , Co Clare

805m
19934CONDITIONAL28 Nov 2019

to install 3 no glamping log cabins to be used as short-term tourist accommodation ancillary to the existing B&B. the proposed development will include an upgrade to the existing wastewater treatment system along with all associated site works

Dooneen View B & B , Lisheencrony , Kilkee

872m
1947CONDITIONAL31 Jan 2019

to demolish an existing dwelling and out buildings ( previously granted under ( Planning Permission Ref: P11-71 ) and construct new dwelling house, relocate and upgrade existing septic tank and percolation area to include packaged wastewater treatment system and polishing filter, reopen existing blocked up site entrance and all ancillary site works

Moyarta East , Carrigaholt , Co. Clare

1.1km
20552CONDITIONAL13 Aug 2020

to construct a boat house and entrance plus all ancillary site works

Moyarta East , Carrigaholt , Co Clare

1.1km
2460100N/A7 Mar 2024

for the following development: (a) permission to demolish the existing sub-standard sheds to the rear of the dwelling; (b) permission to construct a replacement machinery / storage shed; (c) permission to construct a new stand alone building to the rear and side of the dwelling which will be ancillary to the use of the main dwelling house consisting of a utility room, laundry room, plant room, home office and gym; (d) permission for all associated site works and services; and (e) temporary retention permission of the existing mobile home on site for a period of three years.

Moyarta East , Carrigaholt , Co. Clare.

1.1km
2660255N/A22 Apr 2026

for the following development: to (a) demolish the existing sub-standard sheds to the rear of the dwelling; (b) construct a replacement garage / utility building; (c) construct new extensions to the front and side of the existing dwelling house; (d) make elevational changes to the existing house; (e) upgrade the existing wastewater treatment system; (f) carry out all associated site works; and RETENTION permission for a maximum temporary period of three years for the location and use of the existing mobile home on site

Moyarta East , Carrigaholt , Co. Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?