22739
REFUSEDWaterford - Waterford City and County Council
Proposed Development
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application
View the full application file on the council's planning portal →Application Timeline
Application received
22 Aug 2022
Further information requested
13 Oct 2022
Further information received
22 Jun 2023
Decision: REFUSED
29 Aug 2023
Decision due
31 Aug 2023
Appeal submitted
21 Sept 2023
Application Details
- Location
- Woodstock and Kereen Lower , Cappoquin , Co. Waterford
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Waterford City and County Council
Timeline
- Registration Date
- 22 August 2022
- Status
- DECISION MADE
- Decision
- REFUSED
- Decision Date
- 29 August 2023
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-318072-23
- Decision
- WITHDRAWN
- Submitted
- 21 September 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application
Kereen Lower , Cappoquin , Co. Waterford
PERMISSION for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application
Woodstock and Kereen Lower , Cappoquin , Co. Waterford
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application.
Woodstock & Kereen Lower , Cappoquin , Co. Waterford
the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application
Woodstock and Kereen Lower , Cappoquin , Co. Waterford
to extend the infill part of the Exhausted Quarry with Inert Material and an area to recycle construction materials
Kereen Lower , Cappoquin , Co. Waterford
to extend the infill part of the Exhausted Quarry with Inert Material and an area to recycle construction materials
Kereen Lower , Cappoquin , Co. Waterford
to extend the infill part of the Exhausted Quarry with Inert material and an area to recycle construction materials. The activity involved an activity that requires a Waste Facility Permit.
Kereen Lower , Cappoquin , Co. Waterford
Extension of Duration to Planning File 17/160 to extend the infill part of the exhausted quarry with inert material and an area to recycle construction materials. The activity involves an activity that requires a waste facility permit
Kereen Lower , Cappoquinn , Co. Waterford
for the construction of a detached timber-frame dwelling, wastewater bio treatment tank and raised soil polishing percolation area, potable well, vehicular entrance and all associated site works
Woodstock , Cappoquin , Co. Waterford
the minor amendments to development permitted under ref. no 23/60610 and comprises the replacement of a detached timber-frame dwelling with a detached block-work dwelling, including ancillary localised site works. The residential development permitted under ref. no. 23/60610 remains otherwise unchanged.
Woodstock , Cappoquin , Co. Waterford
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?