CONDITIONALClare - Clare County Council
Proposed Development
of alterations and changes to dwelling house and septic tank, as constructed, from grant of permission reference P8/26445
View the full application file on the council's planning portal →Application Timeline
Application received
2 Feb 2022
Decision due
29 Mar 2022
Decision: CONDITIONAL
29 Mar 2022
Grant issued
6 May 2022
Application Details
- Location
- Sorrel Island , Lissycasey , Co Clare
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Clare County Council
- Floor Area
- 1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 2 February 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 29 March 2022
- Grant Date
- 6 May 2022
- Permission Expires
- 5 May 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for development at lands at Crossmore County Clare in the townlands of Furroor, Illaunatoo or Sorrelisand, Boolynakockaun and Booltiagh. The development will consist of: 1. Amendment to item (1) of Permitted Development Pl. Ref: 21/1057 to install a 38kV electrical connection over a total length of approximately 11km, from the permitted Crossmore Wind Farm (Pl. Ref: 09/123, as extended under Pl. Ref: 19/388 and altered by Pl. Ref: 20/284) to the entrance to the existing Booltiagh 110kV electrical substation. This amended connection will consist of: a. Revision to site boundaries as permitted under Pl. Ref: 21/1057; b. Removal of permitted overhead line from permitted polesets north of Local Road L2084 (previously numbered polesets 1-40 consented under Pl. Ref: 21/1057) for a distance of circa 4km and its replacement with c. 6.5km of underground electrical cabling along unnamed Local Roads. c. Relocation of permitted poleset number 40 (consented under Pl. Ref: 21/1057) 7m (meters) south. Redesign of poleset number 40 from double (as permitted under Pl. Ref: 21/1057) to triple (termination) poleset. The entirety of the grid connection from Crossmore Wind Farm to the existing Booltiagh 110kV electrical substation will therefore comprise c. 5.5km of overhead line (poleset numbers 41-93 conscented under Pl. Ref: 21/1057) c. 6.5km of underground cable (proposed under subject application) 2. Site Drainage 3. All associated site development and ancillary works. The application will be accompanied by a Natura Impact Statement (NIS)
Crossmore , Co Clare
for development which will consist of: carry out extensions and alterations to existing habitable dwelling house including (a) RETAIN rear part of existing house and removed remaining structure (b) construct extension and alterations to remaining part of existing dwelling house (c) new connected garage (d) remove existing out buildings as shown (e) connect to existing services and associated site works.
Frure , Lissycasey , Co. Clare
to construct a new dwelling, garage, site entrance and wastewater treatment system along with all ancillary works on the site
Frure North , Lissycasey , Co. Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.
Do I Need Permission?