22796
CONDITIONALKildare - Kildare County Council
Proposed Development
development on the north campus, Maynooth University. The development will consist of the installation of 8 No. stand alone modular study pod units along with all associated site development works
View the full application file on the council's planning portal →Application Timeline
Application received
30 Jun 2022
Decision: CONDITIONAL
22 Aug 2022
Decision due
24 Aug 2022
Grant issued
17 Oct 2022
Application Details
- Location
- North Campus Maynooth University , Maynooth , Co. Kildare.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.016 ha
Timeline
- Registration Date
- 30 June 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 22 August 2022
- Grant Date
- 17 October 2022
- Permission Expires
- 16 October 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Extension of Duration of Planning Ref. 18/1073 - phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall
Arts Building , North Campus , Maynooth University
the construction of an extension to North East of the Electronic Engineering Building to provide accommodation for a national facility for radio science and 5 G wireless testing and research. The extension is to be comprised of; a testing chamber with associated measurement control room, service corridors, entrance lobby and connection to the existing Electronic Engineering Building including all associated site and ancillary works
Maynooth University North Campus , Maynooth , Co. Kildare
phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall
Arts Building , North Campus , Maynooth University
for development at this c. 0.38ha site, on lands located at the Pheonix Sports and Restaurant Building. The proposed development is comprised of the partial demolition of c. 350 sqm of the south-eastern section of the existing sports building. (The Phoenix Sports Centre and Restaurant Building). This is to facilitate the construction of a new 3 no. storey sports science extension (c. 3,427sqm), comprised of lobby and reception areas; general gym; sports hall; research and teaching labs; administrative offices and associated teaching, student, and staff facilities. The development also includes removal of an existing cycle storage area and the provision of a new covered bike storage, all site development works hard and soft landscaping; plant; public lighting; signage; piped infrastructure and ducting; boundary treatments; SUDs; changes in level and all associated site development, clearance and excavation works above and below ground
The Pheonix Sports and Restaurant Building , Maynooth University , Maynooth
the installation of a new compound to include three standby generators with a capacity of 1500KVA each, fuel storage tank and electrical installations, protective bund along with all associated site development works to include protective perimeter fencing to compound
The North Campus , Maynooth University , Maynooth
for existing development on the north campus, Maynooth University, Maynooth, Co. Kildare. The existing development consists of a temporary tensile structure currently in use providing outdoor sheltered seating along with all associated site development works
Maynooth University , Maynooth , Co. Kildare.
change of use to previously granted planning permission (P.A Ref No: 10/906 & ABP Ref. No: PL 09.239119) to areas as follows: 1. Retail Unit change of use to Residents Reception 2. Students Social Room change of use to Residents Administration Office and associated supporting accommodation: all located at ground floor of Courtyard 01 Building of Student Housing Complex at North Campus
National University of Ireland Maynooth , Maynooth , Co. Kildare
change of use to previously granted planning permission (P.A. Ref. No. 10/906 and ABP Ref. No. PL 09.239119) to areas as follows: (1) Retail unit change of use to Residents’ Reception. (2) Students’ Social Room change of use to Residents’ Administration Office and associated supporting accommodation; all located at ground floor of Courtyard 01 Building of Student Housing Complex
North Campus of the National University of Ireland Maynooth , Maynooth , Co. Kildare.
development on the North Campus, Maynooth University, Maynooth, Co Kildare. The development will consist of the provision of an outdoor gym facility and sports area along with all associated site development works
North Campus , Maynooth University , Maynooth
A new Maynooth University Students Centre across two building blocks with a shared external space contained under a new canopy. The development consists of two, two-storey buildings with screened mechanical plant at roof level, providing circa 3700m2 new floor space. External works will include a new access road and culvert, canopy structure, localized hard and soft landscaping, bicycle storage, the installation of a water attenuation tank, upgrade works to existing switch rooms and the demolition of a single storey blockwork storage unit at lands to the west of the existing Phoenix Building on the North Campus,
Maynooth University , Maynooth , Co.Kildare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?