228008
N/AClare - Clare County Council
Proposed Development
to carry out the following development: Improvement works to St Brigids Section E and the development of an extension to the existing Burial Ground at Drumcliff, Ennis, Co Clare. The development will include: 1) An addition of circa 350 double plots including provision for ash plots. 2) Access road improvements including lay-bys, turning circle and traffic calming measures. 3) Parking; 23 stardard spaces, 6 Wheelchair accessible spaces. 3) Footpaths. 4) Drainage. 5) Planting and landscaping including Columbarium and Reflectance Garden. 6) Associated Site Works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
View the full application file on the council's planning portal →Application Timeline
Application received
9 Sept 2022
Application withdrawn
16 Dec 2022
Decision due
18 Dec 2022
Application Details
- Location
- Drumcliff , Ennis , Co Clare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
Timeline
- Registration Date
- 9 September 2022
- Status
- WITHDRAWN
- Decision
- N/A
- Decision Due
- 18 December 2022
- Withdrawn
- 16 December 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to carry out the following development: Improvement works to St Brigids Section E and the development of an extension to the existing Burial Ground at Drumcliffe, Ennis, Co Clare. The development will include: 1) Circa 350 double plots and provision for ash plots, 2) Access road improvements including lay-bys, turning circle and traffic calming measures, 3) Parking; 23 standard spaces, 6 Wheelchair accessible spaces, Footpaths, Drainage, Planting and landscaping including Columbarium and Reflectance Garden 4) Associated Site Works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
Drumcliffe , Ennis , Co Clare
to construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
Drumcliff , Ennis , Co. Clare
to construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
Drumcliff , Ennis , Co. Clare
of existing garden shed, as constructed
Drumcliff , Ennis , Co. Clare
the development will consist of: demolition of an existing dwelling house and construction of a single replacement dwelling house, provision of a new vehicular access onto the Drumcliff Road, provision of a new waste water treatment system, percolation area, and connections ancillary to the residential development, appropriate landscaping and boundary treatments, as well as all associated site development works and services. The Planning Application is accompanied by a Natura Impact Statement.
Drumcliff , Ennis , Co Clare
to relocate an existing shared access road and the change of use of an existing gravel yard at the rear of Gort Road Business park, provide two additional car parking area with associated site development works at the rear and side of Unit 20
Gort Road Business Park , Gort Road , Ennis Co Clare
the development will consist of alterations, extension and renovations of existing building with increased height, mezzanine floor, 5 no parking spaces, relocated and widened site access location, signage and associated site works
Unit 7 , Gort Road Industrial Estate , Gort Road
for alterations to the vehicular entrance layout and the car-parking layout previously granted planning permission under planning reference P21/930 and all associated site development works at the rear and side of Unit 20
Unit 20 , Gort Road Business Park , Ennis Co. Clare
for alterations to the vehicular entrance layout and the car-parking layout previously granted planning permission under planning reference P21/930 and all associated site development works at the rear and side of Unit 20,
Gort Road Business Park , Ennis , Co. Clare
to use first floor of structure for office space ancillary to the production facility granted under P22-287
Unit 7 Gort Road Industrial Estate , Gort Road , Ennis Co Clare
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.