The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

22805

N/A

Kilkenny - Kilkenny County Council

Proposed Development

Of Planning Permission Reference 18/187

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Dec 2022

  2. Further information requested

    23 Feb 2023

  3. Application withdrawn

    15 May 2023

Application Details

Location
Ballyconra , Ballyragget , Co Kilkenny
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Kilkenny County Council

Timeline

Registration Date
22 December 2022
Status
WITHDRAWN
Decision
N/A
Withdrawn
15 May 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
18187CONDITIONAL22 Mar 2018

to construct (i) milking parlour with collecting yard and handling/crush yard (ii) slatted tank (iii) over ground slurry tower (iv) cubicle area (v) meal bin and all associated site works at

Ballyconra , Ballyragget , Co. Kilkenny

22m
2360147CONDITIONAL17 Apr 2023

to construct (i) Slatted tank (ii) Calf shed and all associated site works

Ballyconra , Ballyragget , Co. Kilkenny

542m
2360201CONDITIONAL19 May 2023

A 10 year planning permission for a solar PV development on a ca. 13Ha Site incorporating: • Solar panels on ground-mounted frames over an area of ca. 6.5 ha, string inverters, 1 no. containerised transformer unit, post and wire fencing, CCTV system with 4 no. pole mounted cameras and landscaping; • Underground electrical cables connecting the solar PV development to existing onsite substation. Proposed extension to existing onsite substation of 51.3sqm; • A temporary construction compound; and, • All associated ancillary site development works. The Site is located within the boundary of an Industrial Emissions Licensed facility regulated by the Environmental Protection Agency, Licence number P0359-03.

Tirlan , Ballyconra Ballyragget , Kilkenny

689m
17515REFUSED3 Aug 2017

for:(a) single storey temporary dwelling for 5 year period: (b) domestic store; (c) entrance; (d) replacement septic tank with percolation area and (e) retain and complete domestic garage/store and all associated site works

Ballyconra , Ballyragget , Co. Kilkenny

690m
2360427CONDITIONAL26 Sept 2023

for new foul effluent treatment system and percolation area and all associated site works

Ballyconra , Ballyragget , Co. kilkenny

723m
1868CONDITIONAL2 Feb 2018

for (a) Renovate and Extend existing dwellinghouse including raising ridge height and demolition of existing extension to rear of dwellinghouse; (b) construct domestic shed/store; (c) enlarge existing entrance and (d) Retention Permission to retain mobile home for a 5 year period and all associated site works at

Ballyconra/Seskin North , Ballyragget , Co Kilkenny

742m
2360556CONDITIONAL4 Dec 2023

for development at their Milk Processing Plant comprising: -Construction of a process building to accommodate two number evaporators, and associated equipment, associated plant and equipment rooms, roof mounted air handling equipment, a transformer enclosure and pipe and service bridges. -A link corridor connection to the existing Whey Factory. - Installation of 2 number water recovery silos affixed to concrete plinths. - Associated site works including earthworks, retaining walls, realignment of the existing internal roads to facilitate vehicle movements, drainage works and all associated site works including landscaping. This facility holds an industrial emissions licence issued by the Environmental Protection Agency

Ballyconra , Ballyragget , Co Kilkenny

801m
17817CONDITIONAL8 Dec 2017

for permission for development at their Milk Processing Plant comprising: - A process building to accommodate 14 process tanks and associated equipment, associated plant and equipment rooms and roof mounted air handling equipment. - Links to the existing Whey Factory and Workshop. - Associated site works including earthworks, retaining wall, drainage and road diversions, pipe and service bridges and the removal of existing external process tanks. - Electrical plant rooms to be located on top of an existing factory building to replace an existing electrical room inside the building. The new process building will provide a controlled and hygienic environment for existing product storage. The new electrical plant rooms are required to relocate an existing internal electrical room which is substandard and no longer acceptable. The milk processing plant site holds on industrial emissions licence issued by the Environmental Protection Agency

Ballyconra , Ballyragget , Co. Kilkenny

809m
2560219CONDITIONAL24 Apr 2025

for development at their Dairy Processing Plant in Ballyconra, Ballyragget, Co Kilkenny comprising: - Demolition of an existing diesel bund, a chemical storage bund, and of an existing IBC containment area and for the reconstruction of all, at revised locations. - Construction of a two-storey process building. - Construction of a 6-bay intake / dispatch canopy and associated single storey services and welfare building. - Construction of a refrigeration building with roof mounted mechanical equipment, a transformer enclosure, a chilled water storage tank and a hot water storage tank - Construction of a CIP centre complete with associated tanks and vessels and a hot water storage tank adjacent. - Construction of a new chemical storage bund and relocation of an existing permeate storage silo. - Construction of a silo base and plinth for the housing and installation of 10 number silos. - Installation of a modular site cabin and a lightweight metal shed. - Construction of a penthouse roof arrangement, installation of roof mounted transformers and roof mounted air handling equipment. - Construction of an extension to an existing car park complete with modified access - Construction of a new internal access road and for the widening and realignment of the existing internal road network. - Construction, incorporating modifications to an existing external stair and retaining wall arrangement. - Associated site works including earthworks, berm formation, retaining walls, pipe and service bridges, fencing and screening and drainage works including a new process effluent line with overground and below ground sections, and all associated site works including landscaping. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will accompany this application.

Tirlán Ltd , Ballyconra Ballyragget , Co. Kilkenny.

827m
22386CONDITIONAL14 Jun 2022

for development at their site, the development will consist of: The proposed replacement of an existing Heater Battery through the installation of a new unit complete with supporting platform, to be positioned on an existing roof, all complete with the provision of an external access stairs serviced through an extension of an existing external stairs and all associated site works. The proposed development will result in improved operational efficiency, improved energy efficiency and site safety. The milk processing plant site holds an industrial emissions licence issued by the Environmental Protection Agency

Ballyconra , Ballyragget , Co. Kilkenny

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?