2285
N/ATipperary - Tipperary County Council
Proposed Development
construction of a proposed two-storey dwelling, domestic garage, a proposed wastewater treatment system with percolation area and all associated siteworks including a site entrance
View the full application file on the council's planning portal →Application Timeline
Application received
3 Feb 2022
Application withdrawn
25 Mar 2022
Application Details
- Location
- Pintown and Irby , Roscrea , Co Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.493 ha
- Floor Area
- 244.4 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 3 February 2022
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 25 March 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a proposed two-storey dwelling, domestic garage, a proposed wastewater treatment system with percolation area and all associated siteworks including a site entrance
Pintown and Irby , Roscrea , Co Tipperary
alterations to existing dwelling to include: changes to elevations, extension to the rear and all ancillary works
Pintown , Roscrea , Co Tipperary
revised entrance arrangement
Carrick , Roscrea , Co Tipperary
the following works to premises as previously granted planning permission under planning ref 02510838: a) retain changes to elevations, b) retain extensions to workshop, c) retain internal layout changes, d) retain first floor offices/storage
Carrig , Roscrea , Co Tipperary
a two storey extension to front of dwelling, and subdivision of part of existing dwelling, to create new dwelling with attached granny flat and all ancillary site works
Carraig , Roscrea , Co Tipperary
extension to side of existing house with new Wastewater Treatment System and Tertiary Filter and all associated site works
Carrick , Roscrea , Co. Tipperary
existing home office/studio
Willisson , Roscrea , Co. Tipperary
1) single story 3 bay extension to the production area, 2) single story extension to existing storage and dispatch facilities including 3 loading bays for large trucks and 3 van loading bays complete with disabled toilet, 3) new entrance and use of existing entrance as exit and site improvements including concrete area for washing vehicles and PERMISSION for RETENTION of 4) office entrance permanently and 5) plant room at rear of factory permanently
Parkmore , Roscrea , Co Tipperary
a new wastewater treatment system and all associated site works
Borris , Roscrea , Co. Tipperary
existing home office/studio
Willisson , Roscrea , Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?