22890
CONDITIONALLimerick - Limerick County Council
Proposed Development
replacement cattle crush as constructed together with all associated incidental works
View the full application file on the council's planning portal →Application Timeline
Application received
12 Aug 2022
Decision: CONDITIONAL
4 Oct 2022
Decision due
6 Oct 2022
Grant issued
8 Nov 2022
Application Details
- Location
- Fairyhall , Montpelier , Co. Limerick
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Limerick County Council
Timeline
- Registration Date
- 12 August 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 4 October 2022
- Grant Date
- 8 November 2022
- Permission Expires
- 7 November 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
relocation of the existing Ardnacrusha Birdhill 38Kv Line
Montpelier , O'Briensbridge , Co. Limerick.
1. Raw Water Intake & Pumping Station site (RWI&PS) which will consist of: a Bankside Intake Chamber, Raw Water Pumping Station Building, 2 no. Microfiltration Buildings, Electricity Substation, (Totalling 3,165m² Gross Floor Area (GFA), maximum building height of 10.9m over finished ground level); 4 no. surge vessels; associated below ground tanks; 670m access road from the R494; 16 no. car parking spaces; telemetry mast (14.0m height); landscaping, lighting, and other ancillary above and below ground works; on a c. 4.1 ha permanent site at Garrynatineel and Kilmaglassderry, Co. Tipperary, and associated re-profiling works to the Parteen Basin. 2. Raw Water Rising Mains (RWRM) which will consist of twin steel underground pipelines (each 1,500mm diameter) extending 2km from the pumping station at the RWI&PS site to the Raw Water Balancing Tanks at the head of the proposed Water Treatment Plant, laid at a minimum depth of cover of 1.2m above crown of pipe. 3. Water Treatment Plant site (WTP) which will consist of: 2 no. Raw Water Balancing Tanks, 3 no. Water Treatment Module Buildings, 2 no. Sludge Dewatering Buildings, 2 no. Sludge Storage Buildings, Chemical Dosing Manifold Building, Chemical Dosing Building, High Lift Pumping Station, an Electricity Substation, Washwater Settlement building, Control and Visitor Building (Totalling c. 53,300m² GFA, maximum building height of 15.6m over finished ground level); associated pumping stations, lagoons, attenuation pond, above and below ground tanks, 5 no. surge vessels; 640m access road from the R445; 50 no. car and 4 no. coach parking spaces; telemetry mast (14.0m height); ground and roof mounted PV panels; landscaping, lighting, and other ancillary above and below ground structures and works; on a c.31 ha permanent site at Incha Beg, Knockadromin and Greenhills, Birdhill, Co. Tipperary. 4. A single 1,600mm diameter steel underground treated water pipeline (covering a distance of approximately 37km in County Tipperary) extending in a generally north-eastern alignment between the proposed Water Treatment Plant and the proposed Break Pressure Tank, laid at a minimum depth of cover of 1.2m above crown of pipe. 5. Break Pressure Tank (BPT) site which will consist of: a below ground covered Break Pressure Tank (volume 13,776m3); control building (c. 800m² GFA, 7.5m height); 794m access road from the L1064; 10 no. car parking spaces; telemetry mast (14.0m height); ground and roof mounted PV panels; Bat
Montpelier and Fairyhall , Limerick.
(a) provision of 12 no. residential units comprising; 3 no. single storey 2 bedroom dwellings; 4 no. two storey 2 bedroom dwellings, 5 no. two storey 3 bedroom dwellings; (b) hard landscaping including roads, footpaths, parking, garden walls, and public lighting; (c) soft landscaping including lawns, trees and hedgerows; (d) provision of new water connections, a foul sewer connection, and a surface water drainage system; (e0 all associated site works
Brookhaven , Montpelier , Co. Limerick.
a new dormer type house, complete with a domestic garage, effluent treatment system and a new site entrance
Montpelier , Castleconnell , Co. Limerick.
a new single storey house complete with a domestic garage, effluent treatment system and a new site entrance
Montpelier , Castleconnell , Co. Limerick
a new boat storage container and planning permission for works to include new decorative cladding at the front and sides of the container
Montpelier Community Centre , Montpelier O'Briensbridge , Co. Limerick
alterations to an existing dwelling house, the demolition of existing rear flat roof area, the demolition of an outbuilding the construction of a proposed 73m2 extension to the rear of existing dwelling, the upgrading of existing entrance and a proposed new driveway to access the proposed new extension to the rear of the property, and all ancillary site works
The Fair Green , Montpelier , Co Limerick
alterations and extension to existing dwelling house & retention of shed
Derryhasna , O'Briens Bridge , Co. Limerick
relocation of the existing Ardnacrusha Nenagh Birdhill 38Kv Line
Montpelier , Castleconnell , Co. Limerick.
for development the development consists of a new floating mooring for canoe, row boat and small craft access, access platform and gangway, upgrade of existing onshore access path. A Natura Impact Statement and Ecological Impact Assessment have prepared in respect of the proposed development
O'Briensbridge , Co Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?