(A) RETAIN GARAGE TO THE NORTH OF EXISTING DWELLING HOUSE AS CONSTRUCTED, (B) RETAIN ROOF LIGHTS TO THE SOUTH ELEVATION OF EXISTING DWELLING HOUSE AS CONSTRUCTED, (C) RETAIN EXISTING GARDEN SHED AS CONSTRUCTED AND ALL ASSOCIATED SITE WORKS WITHIN REVISED SITE BOUNDARIES

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Aug 2022

  2. Decision: CONDITIONAL

    21 Oct 2022

  3. Decision due

    23 Oct 2022

  4. Grant issued

    25 Nov 2022

Application Details

Location
DROM WEST , GLENBEIGH , CO KERRY V93 YP83
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kerry County Council
Site Area
0.3 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
29 August 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
21 October 2022
Grant Date
25 November 2022
Permission Expires
24 November 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

44m
221346REFUSED22 Dec 2022

CONSTRUCT A DWELLING HOUSE SERVED BY MECHANICAL AERATION UNIT AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS

DROM , GLENBEIGH , CO KERRY

79m
23959CONDITIONAL4 Sept 2023

(1) TO RENOVATE EXISTING SINGLE STOREY DWELLING, (2) CONSTRUCT SINGLE STOREY EXTENSIONS TO THE SOUTH (SIDE) AND WEST (REAR) OF THE DWELLING, (3) REMOVE EXISTING STEELTECH SHED AND REPLACE WITH A MASONRY BUILT SHED, (4) ALTER EXISTING SITE ACCESS, (5) DECOMMISSION EXISTING FOUL TREATMENT SYSTEM AND INSTALL A NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM, (6) ALL ANCILLARY SITE WORK

DROM , GLENBEIGH , CO KERRY

369m
18536CONDITIONAL5 Jun 2018

CONSTRUCT A DWELLING HOUSE C/W SECONDARY TREATMENT UNIT AND SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS

DROM WEST , GLENBEIGH , CO KERRY

400m
18858CONDITIONAL31 Aug 2018

CONSTRUCT A SINGLE STOREY TYPE DWELLING HOUSE C/W SECONDARY TREATMENT UNIT AND SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS IN ACCORDANCE WITH PLANS AND PARTICULARS SUBMITTED

DROM WEST , GLENBEIGH , CO KERRY

587m
2660228CONDITIONAL13 Mar 2026

Build a Dwelling House and install a Mechanical Aeration Unit and Soil polishing Filter

Coolnaharrigill Upper , Glenbeigh , Co. Kerry

663m
23522N/A10 May 2023

(1) DEMOLISH SINGLE-STOREY SPLIT LEVEL DETACHED DORMER BUNGALOW AND SINGLE-STOREY SHED TO REAR AND SIDE ON WEST BOUNDARY, (2) CONSTRUCTION OF A REPLACEMENT HOUSE, SINGLE-STOREY TO THE FRONT (SOUTH) AND SIDE (WEST) ELEVATION AND TWO-STOREY TO THE SIDE (EAST) AND REAR (NORTH) ELEVATIONS, (3) CONSTRUCTION OF SOLAR PANELS AND 5 NO. ROOFLIGHTS TO FRONT ROOFS AND 3 NO. ROOF-LIGHTS TO REAR ROOFS, (4) CONSTRUCTION OF NEW PEDESTRIAN GATE TO SIDE (WEST BOUNDARY), (5) CONSTRUCTION OF NEW WASTE-WATER TREATMENT PLANT TO REPLACE THE EXISTING AND ASSOCIATED DRAINAGE, (6) ALL ASSOCIATED SITE LANDSCAPING AND SITE DEVELOPMENT WORKS

ROSSBEIGH , GLENBEIGH , KILLARNEY

665m
23697REFUSED20 Jun 2023

(1) DEMOLISH SINGLE STOREY SPLIT LEVEL DETACHED DORMER BUNGALOW AND SINGLE STOREY SHED TO REAR AND SIDE ON WEST BOUNDARY (2) CONSTRUCTION OF A REPLACEMENT HOUSE,SINGLE STOREY TO THE FRONT (SOUTH) AND SIDE (WEST) ELEVATION AND TWO STOREY TO THE SIDE (EAST) AND REAR (NORTH) ELEVATIONS (3) CONSTRUCTION OF SOLAR PANELS AND 5 NO. ROOFLIGHTS TO FRONT ROOFS AND 3 NO. ROOFLIGHTS TO REAR ROOFS (4) CONSTRUCTION OF NEW PEDESTRIAN GATE TO SIDE (WEST) BOUNDARY (5) CONSTRUCTION OF NEW WASTE WATER TREATMENT PLANT TO REPLACE THE EXISTING AND ASSOCIATED DRAINAGE (6) ALL ASSOCIATED LANDSCAPING AND SITE DEVELOPMENT WORKS

ROSSBEHY DROM WEST , ROSSBEIGH , CO KERRY

669m
19338CONDITIONAL3 Apr 2019

EXTEND AND RENOVATE THE EXISTING COTTAGE WITH ALL ASSOCIATED SITE WORKS

COOLNAHARRAGILL UPPER , GLENBEIGH , CO KERRY

672m
2460189CONDITIONAL2 Apr 2024

planning Permission to a) refurbish and extend an existing dwelling, b) decommission the existing septic tank and percolation area, c) install a new mechanical treatment unit and raised sand polishing filter, d) construct a vehicular site entrance and e) construct all associated site works at Coolnaharragill Upper, Glenbeigh, Co. Kerry

Coolnaharragill Upper , Glenbeigh , Co.Kerry

767m
191136CONDITIONAL7 Nov 2019

RETAIN EXISTING DWELLING HOUSE AND BASEMENT SHED/GARAGE AS CONSTRUCTED

COOLNAHARRAGILL LOWER , GLENBEIGH , CO KERRY