2297

CONDITIONAL

Clare - Clare County Council

Proposed Development

to replace existing cattle slurry storage facilities with new slatted tank

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Feb 2022

  2. Decision: CONDITIONAL

    31 Mar 2022

  3. Decision due

    3 Apr 2022

  4. Grant issued

    6 May 2022

Application Details

Location
Moynoe , Scariff , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council

Timeline

Registration Date
7 February 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
31 March 2022
Grant Date
6 May 2022
Permission Expires
5 May 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

118m
17127CONDITIONAL23 Feb 2017

to construct a dwelling house, domestic garage, waste water treatment system with percolation area and associated site works

Moynoe , Scariff , Co. Clare

267m
17286CONDITIONAL20 Apr 2017

to erect steel framed garage / shed for private domestic use and all associated site works

Moynoe , Scariff , Co. Clare

420m
25114CONDITIONAL11 Apr 2025

to renovate / alter dwelling, to include removal of part of rear external wall and internal walls, remove lean-to roofs at side and rear and replace with new raised roof, with 3 no. velux type windows and flat roof and to erect new extension at rear, with ancillary works, to provide new internal layout

Meenross , Scarriff , Co Clare

856m
2660092CONDITIONAL23 Feb 2026

for development which will consist of a new dwelling house, domestic shed, site entrance, wastewater treatment system and associated site works and services

Carrowmore , Scarriff , Co. Clare

896m
248009UNCONDITIONAL5 Jul 2024

to carry out the folllowing development: Extension of the existing burial ground at Carrowmore, Scarriff, Co Clare. The proposed development will include: 1. Circa 167 double plots and 10 single plots, 2. Access road improvedments including turning bays, 3. Footpaths, 4. Drainage, 5. Tarmacadam finish to existing parking areas, 6. 2 no. Columbarium Walls and Shrine, 7. Associated site works. In accordance with the Habitats Directive, Apropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determinated has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.

Carrowmore , Scarriff , Co Clare

931m
2160CONDITIONAL2 Feb 2021

to construct a dwelling house and domestic garage, install waste water treatment system with percolation area and associated site works

Carrowmore , Scariff , Co Clare

1.1km
20973N/A18 Dec 2020

for development consisting of a new tranquillity mooring point to include installation of 9m floating jetty. A Natura Impact Statement and Ecological Impact Assessment have been prepared and included as part of the planning application

Scarriff Bay , Scarriff , Co. Clare

1.3km
20877CONDITIONAL20 Nov 2020

to construct a dwellinghouse, accessed utilising the existing roadside vehicular entrance serving the ancestral farmhouse and landholding along with associated site works, including bored well and septic tank treatment system

Clountymweenagh , Mountshannon , Co Clare

1.4km
2360112CONDITIONAL14 Apr 2023

for development which will consist of side and rear extension to existing dwelling, alterations to existing elevations, replacement of existing sewage treatment system and all ancillary works

Tobernagat , Scarriff , Co Clare

1.5km
19710CONDITIONAL9 Sept 2019

to RETAIN (a) Side and rear extensions to dwelling house, (b) Detached Garage and fuel store, (c) Extension to side boundaries together with all associated site development works and services

Ballyminogue , Scarriff , Co. Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?