CONDITIONALMayo - Mayo County Council
Proposed Development
Construction of 1 no. dwelling house and septic tank with percolation area including all other ancillary site work and services
View the full application file on the council's planning portal →Application Timeline
Application received
4 Nov 2022
Further information requested
20 Dec 2022
Further information received
8 May 2023
Decision: CONDITIONAL
31 May 2023
Decision due
4 Jun 2023
Grant issued
1 Jul 2023
Application Details
- Location
- Knockfree , Gloghans , Ballina
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Mayo County Council
- Floor Area
- 206 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 4 November 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 31 May 2023
- Grant Date
- 1 July 2023
- Permission Expires
- 30 June 2028
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The application will consist of planning permission to (1) Alter and extend existing dwelling house, (2) Retention permission of a temporary mobile home (for the duration of the works only), (3) Upgrade wastewater treatment system, and (4) Carry out all ancillary works on site.
Wherrew , Cloghans , Ballina Co.Mayo
CONSTRUCT EXTENSIONS TO DWELLING, RETENTION OF SUNROOM, RETENTION OF DOMESTIC SHED, CONSTRUCTION OF NEW SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
WHERREW , CLOGHANS , CO. MAYO
CONSTRUCTION OF NEW FLOCCULATION TANKS, CONSTRUCTION OF A SOLIDS RESIDUALS MANAGEMENT SYSTEM (TO INCLUDE BACKWASH SETTLEMENT AND EQUALISATION TANKS, THICKENING TANK AND HOLDING TANK), INSTALLATION OF CHEMICAL STORAGE TANK, INSTALLATION OF KIOSK ENCLOSURE TO HOUSE PUMPS AND ALL ANCILLARY SITE WORKS
WHERREW , CLOGHANS , BALLINA
(1) Demolish existing storage building; (2)Construction of a storage shed, roofed manure pit and 4 bay enclosed slatted shed with a creep area and underground slurry storage tank along with all associated site works
Grange , Crossmolina , Co Mayo
Construction of a dwelling house and domestic garage with effluent treatment system and for all associated siteworks
Deelcastle , Cloghans , Ballina Co Mayo
Construction of a new dwelling house and domestic garage with effluent treatment system and for all associated site works
Garracloon , Ballina
The development will consist of the demolition of existing derelict dwelling, construction of new dwelling house, domestic garage, on-site wastewater treatment system, new site entrance together with ancillary site development works.
Grange , Crossmolina , Co Mayo
Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Mayo is 5.87 Hectares (Ha). The proposed development within Co. County Mayo comprises both temporary and permanent works located in the townlands Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 6 No. locations • Temporary modification to street furniture (traffic lights, bench, junction boxes, wall and part of a bridge parapet/railing) at 1No. location • Temporary removal of street lighting, bollard and tree removal at 1No. location. • Temporary removal of a wall and gate, berm regarding, hedge trimming and temporary modification to street furniture at 1No location. • Temporary removal of wall and vegetation as well as temporary modifications to street furniture at 1No. location • Temporary entrance to be constructed at 3 No. locations • Construction of a dual-purpose permanent access and public amenity track of approx. 2.7km at Crossmolina, Co. Mayo • Construction of permanent bridge crossing of the River Deel at Crossmolina, Co. Mayo • Installation of permanent lighting along the access and amenity track at Crossmolina, Co. Mayo • Installation of permanent sustainable drainage system along the access and amenity track at Crossmolina, Co. Mayo • Installation of temporary construction compound to include site offices, welfare facilities and car parking at Crossmolina Co. Mayo. • Reinstatement of all temporary works areas to previous condition • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications wil
Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree , Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree , Co. Mayo
CONSTRUCT DWELLING HOUSE, GARAGE AND WASTEWATER TREATMENT SYSTEM WITH SOIL POLISHING FILTER INCLUDING ALL OTHER ANCILLARY SITE WORK AND SERVICES
CRANNAGH , CLOGHANS , BALLINA
CONSTRUCTION OF A PROPOSED NEW DETACHED DWELLING HOUSE, SEPARATE GARAGE, NEW ENTRANCE, NEW WASTE WATER TREATMENT SYSTEM, CONNECTIONS TO SITE SERVICES AND ALL ASSOCIATED SITE WORKS AND LANDSCAPING
GRANGE , CROSSMOLINA
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?