231053

CONDITIONAL

Kerry - Kerry County Council

Proposed Development

RAISING THE ROOF LEVEL OF MY HOUSE LOCATED

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Oct 2023

  2. Decision: CONDITIONAL

    11 Dec 2023

  3. Decision due

    12 Dec 2023

  4. Grant issued

    22 Jan 2024

Application Details

Location
SAND QUAY BRIDGE STREET , AGHANAGRAN MIDDLE , BALLYLONGFORD CO KERRY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
0.028 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
18 October 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
11 December 2023
Grant Date
22 January 2024
Permission Expires
21 January 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
23462N/A27 Apr 2023

(A) DEMOLISH EXISTING REAR EXTENSION, (B) RENOVATE THE EXISTING DWELLING HOUSE WHICH INCLUDES RAISING THE ROOF LEVEL AND THE FLOOR LEVEL AND (C) ERECT A SINGLE STOREY AND TWO STOREY FLAT ROOF EXTENSION TO THE REAR OF THE SAME DWELLING HOUSE

SAND QUAY BRIDGE STREET , AGHANAGRAN MIDDLE , BALLYLONGFORD CO KERRY

108m
24188REFUSED13 May 2024

TO ERECT A SINGLE STOREY DWELLING HOUSE WITH MAINS WATER AND WASTE WATER CONNECTIONS AND TO CARRY OUT ALL ASSOCIATED SITE WORKS ON HIS SITE

Bridge Street , Ballylongford , Co Kerry

153m
201291CONDITIONAL23 Dec 2020

(I) A REVISED TRAFFIC AND PARKING LAYOUT ON OVERALL SITE ON BOTH SIDES OF PUBLIC ROAD INCORPORATING A PELICAN CROSSING CONNECTING SOUTHERN CAR PARK TO SUPERMARKET (ii) SINGLE STOREY STORES BUILDING AT THE REAR OF THE EXISTING CENTRAL SUPERMARKET BUILDING, (iii) THE DEMOLITION OF THE EXISTING STORES BUILDING ON THE FRONT (SOUTH EASTERN) OF THE EXISTING SUPERMARKET BUILDING AND THE CONSTRUCTION OF A NEW SINGLE STOREY EXTENSION FOR RETAIL USE AND SEATING AREA, (iv) THE CONSTRUCTION OF A NEW SINGLE STOREY STORES BUILDING AT THE REAR OF THE EXISTING CENTRA SUPERMARKET BUILDING, (v) THE INSTALLATION OF SOLAR PHOTOVOLATIC (PV) PANELS MOUNTED ON THE ROOF OF THE SUPERMARKET BUILDING AND ON THE ROOF OF THE NEW EXTENSION (vi) ALTERATIONS TO THE EXISTING FRONT ELEVATION OF THE SUPERMARKET BUILDING INCLUDING SIGNAGE AND ALL ASSOCIATED SITE WORKS

CENTRA SUPERMARKET , BRIDGE SREET , BALLYLONGFORD

163m
181027CONDITIONAL24 Oct 2018

(A) RETENTION PERMISSION TO RETAIN DWELLING HOUSE, GARAGE AND VEHICULAR ENTRANCE ALL WITHIN REVISED SITE BOUNDARIES AND (B) PERMISSION TO ERECT A SINGLE STOREY EXTENSION TO HIS DWELLING HOUSE AND ALSO INSTALL A WINDOW ON THE NORTHERN GABLE OF SAME DWELLING HOUSE

BRIDGE STREET , AGHANAGRAN MIDDLE , BALLYLONGFORD

173m
21296CONDITIONAL23 Mar 2021

ERECT A COFFEE SHOP WITH CONNECTIONS TO MAINS WATER AND SEWER AND CARRYING OUT ASSOCIATED SITE WORKS

BRIDGE STREET , BALLYLONGFORD , CO. KERRY

174m
2179N/A3 Feb 2021

ERECT A COMMERCIAL BUILDING WITH CONNECTION TO MAINS WATER AND SEWER AND CARRYING OUT ASSOCIATED SITE WORKS AND SERVICES

AGHANAGRAGH NORTH , BRIDGE ST BALLYLONGFORD , CO KERRY

178m
2460499CONDITIONAL29 Jul 2024

I, Jim O’Keeffe, wish to apply for planning permission for proposed development on site located at existing car parking area ancillary to Centra Supermarket, Bridge Street, Ballylongford, Aghanagran Middle, Co. Kerry. Proposed works: 1) alteration to the existing carpark layout, located to the east of Bridge Street, to accommodate the construction of new 24/7 unmanned fuel filling station consisting of 1 no. dispenser pump island dispensing fuel on each side, with canopy over and associated outdoor payment terminal and signage on canopy; 2) installation of new underground storage fuel tanks, and all associated fuel pipework, off-fill points and vents; 3) construction of new ancillary elec/comms service outbuilding to serve the proposed development; 4) alterations to the existing car park layout with provision of 1 no. EV charging space; 5) concrete slab surfacing, asphalt surfacing and associated drainage with the provision of new Class A Petrol interceptor; 6) construction of new footpath and boundary wall between Bridge Street and subject site, new site vehicular entrance and modification to existing entrance, provision of pedestrian crossing on Bridge Street and all associated road safety improvement works; 7) construction of all associated site features including landscaping and boundary treatments, public lighting and all associated site works.

Existing car parking area ancillary to Centra Supermarket , Bridge Sreet Aghanagram Middle , Ballylonford Co. Kerry

224m
21841N/A22 Jul 2021

ERECT A SINGLE STOREY DWELING HOUSE WITH MAINS WATER AND SEWER CONNECTIONS AND CARRY OUT ALL ASSOCIIATED SITE WORKS ON SITE LCOATED

BRIDGE STREET , BALLYLONGFORD , CO KERRY

292m
23671CONDITIONAL13 Jun 2023

CONSTRUCT A MULTI-USE GAMES AREA INCLUDING ASSOCIATED ANCILLARY ISTE WORKS

AGHANAGRAN MIDDLE , BALLYLONGFORD , CO KERRY

297m
20956CONDITIONAL9 Oct 2020

CONSTRUCT A COMMUNITY PLAYGROUND AREA INCLUDING ASSOCIATED ANCILLARY SITE WORKS

AGHANAGRAN MIDDLE , OPPOSITE BALLYLONGFORD NATIONAL SCHOOL , BALLYLONGFORD