The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

23114

CONDITIONAL

Cavan - Cavan County Council

Proposed Development

for the construction of a Training Centre to new Block G. Works include associated site development works, connection to existing site services and effluent treatment plant and percolation area/polishing filter

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Mar 2023

  2. Further information requested

    9 May 2023

  3. Further information received

    2 Jun 2023

  4. Decision: CONDITIONAL

    15 Jun 2023

  5. Decision due

    29 Jun 2023

  6. Grant issued

    25 Jul 2023

Application Details

Location
Block G Corlurgan Business Park , Corlurgan , Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
3 ha

Timeline

Registration Date
16 March 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 June 2023
Grant Date
25 July 2023
Permission Expires
24 July 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
20384CONDITIONAL2 Sept 2020

is sought for alteration and extension to rear of Block C. Works include associated site development works and replacement of existing effluent treatment plant and percolation area in accordance with conditions on Planning Permission Ref 20/186

Block C Corlurgan Business Park , Corlurgan Cavan , Co. Cavan

16m
19171CONDITIONAL15 May 2019

to retain and continue with alterations to elevations and construction of loading bay to Block F (Previous Planning Ref 09/162). Works include construction of extension and ramp to side of unit for loading bay, alterations to first floor mezzanine and associated site development works

Block F , Corlurgan Business Park , Corlurgan

32m
17216N/A26 May 2017

to alter previously approved Block F (Previous Planning Ref. 09/162). The works consist of subdivision into two units, alterations to elevations, connection to existing site services, provision of new mezzanine floor to Unit 1 and fit out of Unit 1 for use as sauce mixing, storage and distribution facility

Block F Corlurgan Business Park , Corlurgan , Co. Cavan

32m
20186CONDITIONAL18 May 2020

for alteration and extension to Block F. Works include replacement of existing effluent treatment plant, replacement of existing percolation area with a new polishing filter in accordance with EPA guidelines, installation of pumping main to new polishing filter located to adjoining lands and associated site development works

Block F , Corlurgan Business Park , Corlurgan

33m
17337CONDITIONAL26 Jul 2017

to retain and continue with alterations to previously approved Block E (Previous Planning Ref. 09/168). The works consist of alterations to elevations, connection to existing site services, provision of new mezzanine floor to Unit 1 and fit-out of Unit 1 for use as sauce mixing, storage and distribution facility

Block E , Corlurgan Business Park , Corlurgan

181m
2460530CONDITIONAL24 Oct 2024

for Demolition of the existing buildings on the site (1,430sq.m) and closure of the existing entrance onto the N55. Construction of a new filling station consisting of: Single storey Service Station Building (957sq.m) measuring predominantly 6.24m high, with a maximum of 8.4m high. It will contain a net retail area of 100sq.m (including ancillary off-licence measuring 10sq.m), 2 no. communal seating areas, 4 no. food/beverage offers, drive-thru facility (hatch and lane), back of house (including toilets, office, staff services and storage) and detached service yard. 4 no. pump islands under a canopy measuring maximum of 5.55m high (with parking for 8 cars). 51 no. car park spaces (with additional spaces as follows: 5 no. EV charging spaces, 3 no. service bays, 4 disabled spaces, 3 drive-thru waiting bays and 6 staff spaces). 10 no. HGV/bus parking spaces. 2 no. car wash bays. 2 no. HGV fueling bays (maximum height of canopy 6.2m high). 10 no. cycle parking spaces. All associated site works including, landscaping, boundary treatment, substation, circulation, lighting, fill points, underground fuel tanks and signage (free standing and on structures). For clarity vehicular access/egress will be from the existing roundabout junction at the north end. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED.

Moynehall , Cavan Town , Co. Cavan

368m
2517CONDITIONAL24 Mar 2025

to remove the existing hay shed and replace it with an agricultural shed which will consist of slatted area with slurry holding tank underneath, cubicles and calving pens. Also construct an underground slurry holding tank and all associated site works

Thomascourt , Cavan , Co Cavan

432m
2560022CONDITIONAL23 Jan 2025

for the renovation of a dwelling including the incorporation of an agricultural barn, and it’s change of use to residential use, and a storey and a half extension. Also included is the demolition of a single storey lean-to structure, elevational changes to the existing buildings, a new wastewater treatment system and percolation area, proposed parking area and all associated site works

Tullycoe , Moynehall , Cavan Co. Cavan

473m
21106CONDITIONAL2 Mar 2021

construct a three bay slatted shed with slurry holding tank underneath and all associated site works

Tullycoe , Moynehall , Cavan

504m
20168CONDITIONAL7 May 2020

to construct fully serviced dwelling, incorporate wastewater treatment system and percolation area, new entrance arrangement and carry out associated site works

Corlurgan , Cavan , Co Cavan

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?