23141
CONDITIONALMonaghan - Monaghan County Council
Proposed Development
permission for a development consisting of a two storey dwelling house, a domestic wastewater treatment system, a new site entrance with all associated site development works
View the full application file on the council's planning portal →Application Timeline
Application received
8 Jun 2023
Decision: CONDITIONAL
1 Aug 2023
Decision due
2 Aug 2023
Grant issued
5 Sept 2023
Application Details
- Location
- Drumdreeny , Culloville , Castleblayney
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Monaghan County Council
- Site Area
- 0.36 ha
- Floor Area
- 233 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 8 June 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 1 August 2023
- Grant Date
- 5 September 2023
- Permission Expires
- 4 September 2028
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
permission for a development consisting of a single storey dwelling house, wastewater treatment system and percolation area, new vehicular entrance and piers together with all ancillary site development works. Significant further information received in relation to the submission of a flood risk assessment report.
Kilmurry , Culloville P.O. , Castleblayney
Permission for the demolition of existing single storey house and replacement with a new single storey dwelling house, single storey domestic storey garage, wastewater treatment system sand polishing filter & reed bed, new vehicular entrance, entrance walls and piers together with all ancillary site development works
Kilmurry , Culloville , Castleblayney
Permission to demolish existing single storey dwelling house and replacement with a new single storey dwelling house, single storey domestic garage, wastewater treatment system, sand polishing filter & reed bed, new vehicular entrance, entrance walls and piers together with all ancillary site development works
Kilmurry , Culloville , Castleblayney
construct a two storey dwellinghouse, ancillary garage, waste water treatment system polishing filter, new entrance onto public road & all associated works. Significant information submitted includes drawings outlining proposed site visibility splays and site section to include 120m visibility sight lines in both directions. A site specific flood risk assessment report has also been prepared.
Corrinshigagh , Culloville , Castleblayney
permission consisting of the importation of subsoil to raise and level existing ground for improvement of existing agricultural land, use of existing entrance and include all associated site works. The class of activity will be; Class 5 & 6 of the third Part II pf the Waste Management (Facility Permit & Registration) Regulations, 20017 as amended
Kilmurry , Cullaville , Castleblayney
Retention permission for development at this site: Drumdreeny, Culloville, Castleblayney, Co. Monaghan. The development will consist of the retention of a domestic garage
Drumdreeny , Culloville , Castleblayney
retention of a domestic garage
Drumdreeney , Culloville , Castleblayney
permission for extension and alterations to existing dwelling house including elevational changes and associated site works
Corrinshigagh , Culloville , Co. Monaghan
on the grant of Outline Planning Permission Reference Number 09/451 for a 1.5 storey dwelling house, a domestic garage, a waste water treatment system and all associated site works
Corcullionglish , Culloville P.O. , Castleblayney
permission for development consisting of a single storey dwelling house, single storey domestic garage, upgrade of existing agricultural entrance to a residential entrance, extend existing access lane, provision of entrance piers, installation of a wastewater treatment system and percolation area together with all ancillary site development works.
Corrinshigagh (Farney By.) Kilmurry E.D. & Drumdreeny , Culloville , Castleblayney
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?