23160
N/ATipperary - Tipperary County Council
Proposed Development
a new single storey house complete with an effluent treatment system and a new site entrance
View the full application file on the council's planning portal →Application Timeline
Application received
9 Jun 2023
Further information requested
28 Jul 2023
Further information received
13 Dec 2023
Application withdrawn
22 Jan 2024
Application Details
- Location
- Curryquin , Dolla , Nenagh
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.292 ha
- Floor Area
- 107 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 9 June 2023
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 22 January 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a new single storey house complete with an effluent treatment system and new site entrance
Curryquin , Dolla , Nenagh
a new single storey house complete with an effluent treatment system and a new site entrance
Curryquinn , Dolla , Nenagh Co. Tipperary
a change of house type from that previously granted under Planning Register Reference 2460926. The proposed development consists of the construction of a two storey dwelling house in lieu of the previously approved 2 storey dormer dwelling, together with all associated site development works and ancillary site works. Completion of partly constructed house , blockwork complete to 1st floor level; Overall height approx 8.5m above finished ground floor level
Curragharneen , Dolla , Co Tipperary
completion of partially constructed property, install waster water treatment system, garage, entrance, driveway and all ancillary works
Curragharneen , Dolla , Nenagh Co. Tipperary
construction of (i) loose shed with underground effluent tank (ii) single-story dwelling (iii) new driveway (iv) wastewater treatment system and percolation area and all associated site works
Barnagore , Dolla , Nenagh
construction of (i) hardcore base, (ii) complete part constructed roadway with hardcore. Permission for retention for (i) agriculture entrance gateway, (ii) man-made pond, (iii) part constructed roadway (iv) removal of hedgerows, (v) hardcore base area and all associated site works
Barnagore , Dolla , Nenagh
single storey house, domestic garage, septic tank, percolation area and entrance - previous Planning No. 12510414
Mountisland , Dolla , Nenagh
the construction of a new house, garage, entrance and waste water treatment system with all associated site works
Curragharneen , Silvermines , Nenagh
construction of a vehicular entrance, dwelling house, domestic garage, septic tank and percolation area together with all associated site works
Curragharneen , Silvermines , Co. Tipperary
renewal of the existing roof structure resulting in an increase in ridge height, refurbishment and alterations to the existing dormer windows; amendment to west gable elevation to reduce size of existing ground floor ope to window, demolition of existing returns and construction of 2 no. single storey extensions, demolition of existing chimneys; upgrade of existing septic tanks with 2 no. waste water treatment systems and associated percolation areas, alterations to site entrances, site levels and boundary treatments and all landscaping and ancillary works
Grallagh , Dolla , Nenagh Co. Tippeerary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count -- build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.
Do I Need Permission?