a 10 year planning permission for development at lands to the north of the N24 National Road in the townlands of Jamestown, Kilmolash Upper, and Rathkeevin County Tipperary. The development will consist of; Construction and operation of a c. 60MW solar PV farm consisting of solar arrays on ground mounted steel frames, with a maximum overall height of 2.6 metres; Internal underground electrical cabling and ducting; Up to 20 no. transformers; 2 no. temporary construction compounds ; security fencing and cameras; 2 no. new gated site entrances from the R687 local road; New internal access tracks; Site drainage; Landscaping; All ancillary works. Planning permission is sought for a period of 10 years with an operational life of 40 years from the date of commissioning. A Natura Impact Statement accompanies the planning application
View the full application file on the council's planning portal →Application Details
- Location
- Jamestown , Kilmolash Upper , and Rathkeevin
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 16 June 2023
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a new two storey dwelling, garage, driveway, treatment system, percolation area and new entrance and all necessary site works
Rathkeevan , Clonmel , Co. Tipperary
construction of a dwelling house, garage, driveway, treatment system, percolation area and new entrance
Rathkeevan , Clonmel , Co. Tipperary
grant of outline permission reference no. 20138 for construction of a new two storey dwelling, garage, driveway, treatment system, percolation area and new entrance and all necessary site works
Rathkeevan , Clonmel , Co. Tipperary
construction of new 2.4m high perimeter fencing to all boundaries, together with new 2.4m high entrance gates
Tir na nOg , Rathkeevin , Clonmel
a 10 year planning permission for development at lands to the north of the N24 National Road in the townlands of Jamestown, Kilmolash Upper, and Rathkeevin County Tipperary. The development will consist of: - Construction and operation of a c. 60MW solar PV farm consisting of solar arrays on ground mounted steel frames, with a maximum overall height of 2.6 metres; - Internal underground electrical cabling and ducting; - Up to 20 no. transformers; 2 no. temporary construction compounds; - Security fencing and cameras; - 2 no. new gated site entrances from the R687 local road; - New internal access tracks; - Site drainage; - Landscaping; - All ancillary works. Planning permission is sought for a period of 10 years with an operational life of 40 years from the date of commissioning. A Natura Impact Statement accompanies the planning application
Townlands of Jamestown , Kilmolash Upper , and Rathkeevin
(1) the relocation of main entrance, provision of a secondary entrance to rear yard, provision of pedestrian entrance, modification of internal access roads, carparking and amenity pathways, (2) timber sheds, LPG tanks, waste receptacles and external generator, modification to percolation area and associated infrastructure, (3) advertising/information signage and external light columns
Rathkeevin , Clonmel , Co. Tipperary
construction of an agricultural building to include cubical housing, straw bedding area and underground slatted tanks, construction of milking parlour, dairy, plant and electrical room, livestock waiting yard, handling facilities, and an underground soiled water tank, erection a meal bin and a water storage tank and all associated site works
Kilmolash , Clonmel , Co. Tipperary
the construction of a slatted cubicle house, together with associated slatted underground slurry storage tank, concrete yards and site works. In addition, we wish to apply for Retention Permission for a walled silage pit and associated concrete silage apron
Kilmolash Lower , Clonmel , Co. Tipperary
construction of a new storage building to the rear of an existing industrial building, the new building will be used to store grain for processing, also including signage and associated site works
Jamestown , Clonmel , Co. Tipperary
construction of a dwelling house, entrance, driveway, treatment system, percolation area and all associated site development works
Rathkeevin , Clonmel , Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?