The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

23166

N/A

Kildare - Kildare County Council

Proposed Development

This development will consist of retention planning permission for existing buildings to include truck repair/maintenance, repair maintenance area, offices, storage buildings and fuel storage tank and all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Hartwell Upper , Kill , Co. Kildare.
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kildare County Council

Timeline

Registration Date
24 February 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

39m
2560027CONDITIONAL17 Jan 2025

for the construction of extensions to the front and sides of the existing building and all associated site development works. Revised by Significant Further Information which consists of: Additional existing temporary structures have been included on the revised Site Layout Plan

Hartwell Upper , Kill , Co. Kildare

39m
2461386N/A20 Dec 2024

for the construction of extensions to the front and sides of the existing building and all associated site development works

Hartwell Upper , Kill , Co. Kildare

45m
23316CONDITIONAL29 Mar 2023

existing buildings to include truck repair/maintenance, repair maintenance area, offices, storage buildings and fuel storage tank and all associated site works

Hartwell Upper , Kill , Co.Kildare

120m
22502CONDITIONAL3 May 2022

development at the subject site of 0.346 hectare at Hartwell Upper, Kill, Co. Kildare. The development will consist of planning permission for a concrete recovery operation for the acceptance and processing for re-use, and temporary storage prior to transporting off-site of concrete material at Hartwell Upper, Kill, Co. Kildare. It is proposed to accept up to 17,000 tonnes per annum of material. The application relates to an activity requiring a Waste Facility Permit from Kildare County Council.

Hartwell Upper , Kill , Co. Kildare.

139m
181211CONDITIONAL3 Oct 2018

the renovation, alterations and refurbishment of existing single storey dwelling, new single storey link extension and new two storey extension to rear of existing dwelling, connection to existing services, relocation of existing entrance, construction of domestic garage to rear of dwelling and all ancillary works

Hartwell Lower , Kill , Co. Kildare.

247m
2574N/A11 Apr 2025

Extension of Duration: for the importation of clean topsoil and subsoil in the subject site of 7.20 hectares in order that the site can be rendered suitable for planting native broadleaf forestry. It is proposed to improve approximately 3.80 ha of the site and it is estimated that this will require approximately 128,000 cubic metres of greenfield, inert soil and stone. The applicant also proposes to install a temporary site office and canteen, wheelwash, portaloo and carry out all ancillary site works. The application relates to an activity requiring a Waste Facility Permit from the Kildare County Council. Revised by significant information consisting of; an Environmental Impact Assessment Report (EIAR) was submitted

Hartwell Upper , Kill , Co.Kildare

293m
19840CONDITIONAL26 Jul 2019

the importation of clean topsoil and subsoil in the subject site of 7.20 hectares in order that the site can be rendered suitable for planting native broadleaf forestry. It is proposed to improve approximately 3.80 ha of the site and it is estimated that this will require approximately 128,000 cubic metres of greenfield, inert soil and stone. The applicant also proposes to install a temporary site office and canteen, wheelwash, portaloo and carry out all ancillary site works. The application relates to an activity requiring a Waste Facility Permit from the Kildare County Council. Revised by significant information consisting of; an Environmental Impact Assessment Report (EIAR) was submitted.

Hartwell Upper , Kill , Co.Kildare

304m
25106CONDITIONAL10 Jun 2025

for the importation of clean topsoil and subsoil in the subject site of 7.2 hectares in order that the site can be rendered suitable for planting native broadleaf forestry

Hartwell Upper , Kill , Co. Kildare

477m
2460947N/A25 Sept 2024

for the installation of a 200kWp of ground mounted solar photovoltaic (PV) panels and all associated ancillary works

Arthurstown Landfill , Kill , Co. Kildare

488m
17788CONDITIONAL7 Jul 2017

to extend and convert existing building into a creative retreat centre and art psychotherapy clinic which consists of, in the existing building, a kiln ceramic room, w.c., lobby and wash area and on the ground floor in the extension a hall, store, individual room, kitchen and group room and on the first floor in the extension an office with five Velux windows and to decommission existing septic tank and percolation area and to construct a new treatment system and percolation area with all ancillary site works

Hartwell Upper , Kill , Naas

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?