23316
CONDITIONALKildare - Kildare County Council
Proposed Development
existing buildings to include truck repair/maintenance, repair maintenance area, offices, storage buildings and fuel storage tank and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
29 Mar 2023
Further information requested
16 May 2023
Further information received
1 Nov 2023
Decision: CONDITIONAL
27 Nov 2023
Decision due
28 Nov 2023
Grant issued
22 Jan 2024
Application Details
- Location
- Hartwell Upper , Kill , Co.Kildare
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Kildare County Council
- Site Area
- 1.416 ha
Timeline
- Registration Date
- 29 March 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 27 November 2023
- Grant Date
- 22 January 2024
- Permission Expires
- 21 January 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the construction of extensions to the front and sides of the existing building and all associated site development works
Hartwell Upper , Kill , Co. Kildare
for the construction of extensions to the front and sides of the existing building and all associated site development works. Revised by Significant Further Information which consists of: Additional existing temporary structures have been included on the revised Site Layout Plan
Hartwell Upper , Kill , Co. Kildare
This development will consist of retention planning permission for existing buildings to include truck repair/maintenance, repair maintenance area, offices, storage buildings and fuel storage tank and all associated site works
Hartwell Upper , Kill , Co. Kildare.
development at the subject site of 0.346 hectare at Hartwell Upper, Kill, Co. Kildare. The development will consist of planning permission for a concrete recovery operation for the acceptance and processing for re-use, and temporary storage prior to transporting off-site of concrete material at Hartwell Upper, Kill, Co. Kildare. It is proposed to accept up to 17,000 tonnes per annum of material. The application relates to an activity requiring a Waste Facility Permit from Kildare County Council.
Hartwell Upper , Kill , Co. Kildare.
the renovation, alterations and refurbishment of existing single storey dwelling, new single storey link extension and new two storey extension to rear of existing dwelling, connection to existing services, relocation of existing entrance, construction of domestic garage to rear of dwelling and all ancillary works
Hartwell Lower , Kill , Co. Kildare.
Extension of Duration: for the importation of clean topsoil and subsoil in the subject site of 7.20 hectares in order that the site can be rendered suitable for planting native broadleaf forestry. It is proposed to improve approximately 3.80 ha of the site and it is estimated that this will require approximately 128,000 cubic metres of greenfield, inert soil and stone. The applicant also proposes to install a temporary site office and canteen, wheelwash, portaloo and carry out all ancillary site works. The application relates to an activity requiring a Waste Facility Permit from the Kildare County Council. Revised by significant information consisting of; an Environmental Impact Assessment Report (EIAR) was submitted
Hartwell Upper , Kill , Co.Kildare
for the importation of clean topsoil and subsoil in the subject site of 7.2 hectares in order that the site can be rendered suitable for planting native broadleaf forestry
Hartwell Upper , Kill , Co. Kildare
the importation of clean topsoil and subsoil in the subject site of 7.20 hectares in order that the site can be rendered suitable for planting native broadleaf forestry. It is proposed to improve approximately 3.80 ha of the site and it is estimated that this will require approximately 128,000 cubic metres of greenfield, inert soil and stone. The applicant also proposes to install a temporary site office and canteen, wheelwash, portaloo and carry out all ancillary site works. The application relates to an activity requiring a Waste Facility Permit from the Kildare County Council. Revised by significant information consisting of; an Environmental Impact Assessment Report (EIAR) was submitted.
Hartwell Upper , Kill , Co.Kildare
to extend and convert existing building into a creative retreat centre and art psychotherapy clinic which consists of, in the existing building, a kiln ceramic room, w.c., lobby and wash area and on the ground floor in the extension a hall, store, individual room, kitchen and group room and on the first floor in the extension an office with five Velux windows and to decommission existing septic tank and percolation area and to construct a new treatment system and percolation area with all ancillary site works
Hartwell Upper , Kill , Naas
for the installation of a 200kWp of ground mounted solar photovoltaic (PV) panels and all associated ancillary works
Arthurstown Landfill , Kill , Co. Kildare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?